BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and paving for a mixed-use development in Golden, Colorado. Completed plans call for the demolition of a residential development; for site work for a residential development; sidewalk / parking lot; and for paving for a residential development.

Reference Number 0000323452 Abatement and Demolition of eight residential structures to prepare and clear property for future development. This project will utilize a three-phase approach, working across the site from East to West. Phase 1 will demolish three structures to allow a separate parking lot project to begin. Phase 2 will demolish the middle three structures. Phase 3 will be abatement of the two remaining structures on the west side of the site. All firms must document they meet the Minimum Requirements as shown in this Advertisement. Please include documentation of qualifications with your Bid, Bid Bond and Labor Burden Calculation. Do not include a Performance or Labor and Material Bond with your bid package. These items will be of the awarded firm at the time of contracting. Question Deadline 06/30/2023 at 5:00 PM MT Questions are submitted online No This project will utilize a three-phase approach, working across the site from East to West. Phase 1 will demolish three structures to allow a separate parking lot project to begin. Phase 2 will demolish the middle three structures. Upon completion of Phase 1 and 2, the East portion of the site will be cleared and turned over to Mines for parking lot work by others. Phase 3 will be abatement of the two remaining structures on the west side of the site. This abatement will require whole house tenting to allow structural elements such as brick mortar and concrete roof slabs to be abated/demolished as one move which will require specific crew capabilities listed in minimum requirements. Complete abatement and demolition drawings by RLH Anser Advisory accompany this AFB notice and will provide the full project scope. See aerial photo below for reference to site constraints and of structures. Schedule for this project is flexible, however target is to begin abatement/demolition between July 24 and August 1 with completion of Phase 1 and 2 by September 1 and completion of all phases of the abatement/demolition by end of September 2023. of Contact/Clarification Name: Sheri Atencio-Church Agency: Colorado School of Mines Phone: 303-273-3615 Fax: NA Email: satenciochurch@mines.edu

Award

Residential Subdivision

$440,000.00

Public - State/Provincial

Demolition, Paving, Site Work

10

12

4

8

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
110
Bidding Soon
1,676
All Active Projects
711
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 7, 2023

July 24, 2023

September 28, 2023

img_map_placeholder

Multiple Locations, Golden, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.