BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Kerrville, Texas. Completed plans call for site work for a educational facility; for paving for a educational facility; sidewalk / parking lot; road / highway; and sidewalk / parking lot.

DESCRIPTION A. Work Included: 1. The "Project" of which the "Work" of this Contract is a part, is titled THS Loop 534 Turn & Acceleration Lane for Kerrville ISD and is composed of an adding a turn lane out of the north student parking lot and extending the existing acceleration lane on Texas Loop 534 and related site work located in Kerrville, Texas. 2. The "Work" of this Contract is titled THS Loop 534 Turn & Acceleration Lane and is defined in the Contract Documents to include, but not necessarily to be limited to: a. The addition of a turn lane out of the north student parking lot and extending the existing acceleration lane on Texas Loop 534 and general construction work for the following campus: i. Tivy High School; 3250 Loop 534, Kerrville, TX 78028 3. Related Work: a. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 01 of these Specifications. b. The work of other contracts is described in various contract documents prepared therefore, some of which are in the possession of the Owner and are available for inspection by interested parties. B. Other Work: 1. Owner (if required by Municipality, State or Federal requirements) shall provide evidence to the municipality permitting the project that an asbestos survey has been completed by a person licensed under the Texas Asbestos Health Protection Act to perform such a survey. 2. The architect/engineer has no responsibility for the discovery, presence, handling, removal, or disposal of or exposure of persons to hazardous materials or toxic substances in any format the project site. 3. The architect/engineer is not required to execute certifications that would require knowledge,services, or responsibilities beyond the scope of the architectural service agreement. 4. The architect/engineer assists the owner in the owner's responsibility to obtain applicable permits fordemolition and construction. 5. Contractor to review and familiarize themselves with owner's Asbestos survey and planand shall inform every worker that they use on this project as to the availability of these surveys and plans prior to starting any work. E furnishing of all labor, materials, and equipment, and performing all work required for the THS Loop 534 Turn and Acceleration Lane for Kerrville ISD, Kerrville, Texas, and in compliance with Project manual and drawings, and other contract documents as prepared by Hewitt Engineering, Inc. B. The School District will receive Part "B" of the Proposal and evaluate the submittal according to the selection criteria in order to determine which Proposal offers the best value to the District. The District will, within forty-five (45) days of the opening of Proposals, rank each of the Proposers using the Selection Criteria. Each Proposer will be notified of the rankings. If cost objectives cannot be reached with the top ranked offer, the District will move to the second ranked offer and other offers in turn until the cost objectives are met. C. Refer to Part 2 of this section for information regarding the proposal evaluation process and procedures PREPARATION OF PROPOSAL A. The Proposer shall submit a competitive sealed proposal for the General Construction of the project as bound in the project manual, Section 00 4200 Part A and Section 00 4335 Part B. A proposal will be considered incomplete unless both Parts A and B of the Proposal are submitted. The Proposer's competitive sealed Proposal shall include all of the following items: 1. Part "A" submission: a. Proposal Section 00 4200, Part A. b. Cashier's Check, Certified Check, or Bid Bond for no less than 5% of the largest possible total for the proposal submitted. 2. Part "B" submission: a. Proposal Section 00 4335 Part "B" B. A Cashier's Check, Certified Check, or acceptable Bidder's Bond payable to the Kerrville ISD, in the amount of not less than 5% of the largest possible total for the proposal submitted, must accompany each proposal in Part "A" of the Proposal submission. C. The successful Proposer will be required to enter into a contract with the Kerrville ISD and to furnish a Performance and Payment Bond of approved form through an approved bonding company duly authorized to do business in the State of Texas, and currently listed in the Department of Treasury Federal Register, in the amount of not less than 100% of the contract price, conditioned upon the performance of the contract. Performance and Payment Bonds shall be in full compliance with Texas Government Code Chapter 2253. AIA Bonds (AIA Document A312) do not comply. Bonding Companies using "Reinsuring Insurance Companies"to expand the Bonding Companies Bonding Limits will not be acceptable unless also approvedby the Owner.

Post-Bid

Roads / Highways

$950,000.00

Public - City

Paving, Site Work

29

6

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
14
Bidding Soon
1,149
All Active Projects
417
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.