Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Appleton, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Site Directions: Outagamie Road and Rueden Ridge (1st Addition) in Town of Buchanan, WI Sealed bids for the Town of Buchanan, 2023 Roadway Construction, Contract B-23, project The work, in general, will include the approximate quantities and items listed below: 6,500 SY Pulverize Asphalt, 4,000 TON Crushed Aggregate Base Course, 500 SY Asphalt Patching, 2,500 TON Hot Mix Asphalt, 11,000 LF Shouldering, 50 LF CMP Culvert The proposals shall be submitted on the forms furnished with the specifications. Each proposal shall be accompanied by a certified check payable to the owner equal to five percent (5%) of the proposal or a bid bond of a bonding company duly authorized to do business in the State of Wisconsin in an amount equal to five percent (5%) of the proposal. This proposal guarantee shall be subject to forfeiture as provided by law. Bidder is encouraged to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site. B. Bidders visiting the Site are required to arrange their own transportation to the Site. C. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions 2 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Justin Keen, P.E. - Cedar Corporation Phone: 920-785-7303 Email: justin.keen@cedarcorp.com 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than five days prior to the date for opening of Bids may not be answered. 7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents Work Areas: 1. Outagamie Road: a. The Work will be substantially complete within 32 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 39 calendar days after the date when the Contract Times commence to run. b. This work shall not begin before September 11, 2023, unless otherwise approved by Owner and Engineer. 2. Rueden Ridge: a. The Work will be substantially complete within 14 calendar days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 21 calendar days after the date when the Contract Times commence to run. 3. Miscellaneous Roadway Asphalt Patching: a. The Work will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 10 calendar days after the date when the Contract Times commence to run. B. All Work: 1. All Work shall be completed by October 27, 2023. When submitting an electronic bid, Bidder is required to deliver the original certified check or bid bond within 72 hours of bid opening to Cedar Corporation. For this project, bids will be received and accepted via electronic bid or by sealed paper copy. Proposals shall not be withdrawn for a period of 60 days after the date of opening. The Town of Buchanan reserves the right to reject any or all of the proposals and to waive any informalities therein
Award
Roads / Highways
$454,711.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 29, 2023
July 28, 2023
Multiple Locations, Appleton, WI
Related To This Project
Appleton, WI
Bid Date: Jul 26 2023
Appleton, WI
Bid Date: Nov 05 2021
Appleton, WI
Bid Date: Jun 28 2023
Appleton, WI
Bid Date: Jul 27 2023
Appleton, WI
Bid Date: Jul 10 2023
Appleton, WI
Bid Date: Mar 12 2019
Appleton, WI
Bid Date: Jul 12 2023
Appleton, WI
Bid Date: Jul 17 2023
Appleton, WI
Bid Date: Jul 12 2023
Appleton, WI
Bid Date: Jul 11 2023
Appleton, WI
--
Appleton, WI
Bid Date: Jul 11 2023
Appleton, WI
Bid Date: Jun 30 2023
Appleton, WI
Bid Date: Jul 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.