Renovation of a retail development in Appleton, Wisconsin. Completed plans call for the renovation of a retail development.

Project Category Code: Heating, Ventilation, Air Conditioning (HVAC) Description: Work consists of replacement of the existing ventilation system. Additional Description: No bid will be opened unless the "Bidders Proof of Responsibility" for 2023 is filed in the office of the City Clerk not later than Friday July 7, 2023. Forms are included in specifications, and are also available at the office of the City Clerk. The document is available on the City website as noted below and is included within the bid documents. Site Directions: 2625 E Glendale Ave 54911 the Project consists of the following Work: 1. Base Bid - replacement of ventilation equipment and associated work. E. Project Schedule: 1. Contractor shall submit a project schedule with a site plan showing proposed phasing, dates, and times for all work a minimum of ten (10) days prior to the initial start of Work. o Schedule must be approved by the Owner's Operations Department and the Consultant. 2. Contractor agrees that Work shall be conducted regularly, diligently, and uninterruptedly at such a rate of progress as will ensure completion by the date specified. 3. It is expressively understood and agreed, by and between the Contractor and the Owner, that the timeframe for completion of this Work, as described herein, is a reasonable time for climatic range and usual industrial conditions prevailing in this locality. F. Time Restrictions: 1. Work must be performed during hours dictated by local ordinances unless otherwise approved 2. Work may be performed Monday through Friday from 7:00 a.m. to 3:30 p.m., which shall be considered regular work hours. o The Contractor may be allowed to work beyond these regular work hours by submitting a proposed schedule, for the following week, and coordinating that daily work schedule with the Owner's representative. G. Construction Constraints: 1. Power shall not be interrupted for more than 4 hours while the circuit breaker in the main switchboard is installed. 2. Power shall not be interrupted at any panelboard or MCC for more than 2 hours. 3. Equipment circuitry shall be interrupted such that no more than one circuit is de-energized at a time. 4. Natural gas shall not be interrupted for more than 2 hours to tie into mains during cold weather (temperatures below 40F). 5. Maximum downtime of heating system shall not exceed 8 hours which must occur when the outside air temperature is anticipated to remain above 60F. Contractor to coordinate with Owner. 6. Either the new or existing supply or exhaust system must be functional at all times or temporary ventilation shall be provided. The existing Make-up Air unit could be utilized in conjunction with the existing relief hoods until the existing Rooftop units are removed and the new units are fully installed. H. Utility Requirements: 1. Contractor shall be responsible for locating and protecting all public and private utilities during the duration of the construction process and shall perform any "potholing" necessary to determine existing utility depths relevant to construction activities.

Bid Results

Retail

$624,750.00

Public - City

Renovation

24

12

11

6

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
17
Bidding Soon
340
All Active Projects
135
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2023

August 11, 2023

img_map_placeholder

2625 E Glendale Ave, Appleton, WI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.