BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Loma Linda, California. Completed plans call for the renovation of a medical facility.

The Department of Veterans Affairs Loma Linda VA Health Care System requires the relocation of Two Hot Water Return Pumps onto a New Cement Pad and the Re-Configuration of All Piping to the New Pump Located in the Mechanical Room 1D-01 at the Loma Linda VA Health Care System (VALLHCS). The two existing Taco hot water return pumps are in the mechanical room 1D-01. There are also some butterfly valves that were not capped correctly to prevent water from leaking through them. By relocating the hot water return, pumps, and re-routing all the copper lines it will eliminate excess piping and fittings which means less water leaks in the system. The system at this time has had many water leaks from the compression fittings. Questions must be submitted in writing and emailed to Freddy Osuna no later than 5 calendar days prior to the date in block 8 of the SF 1449. POP Begin: 07-07-2023 POP End: 12-29-2023 Duration: The site visit is expected to last no more than three (3) hours from 9:30 a.m. (start time) to 12:00 noon (end time). Contractor Meeting Point: On the day of the site visit contractors shall meet at the following location (i.e. the rallying point). at Building 51 Flagpole. Fernando Castaneda Fernando.Castaneda@va.gov (909)825-7084 x2184 - Shall be contacted for questions about the site visit only (i.e. attendee participation, attendee sign up, site visit access, site visit parking, uniform etc.). Freddy Osuna / Contract Specialist - Shall be contacted for questions about the solicitation that are not site visit related. Freddy.Osuna@va.gov (520)629-1711. Questions: All questions must be submitted by email to freddy.osuna@va.gov no later than June 28, 2023 at 3:00pm (EST). The Government reserves the right to not answer questions not meeting this timeline if doing so would result in an amendment requiring and extension of the solicitation and the extension would not be in the best interest of the Government. All responses to questions will be provided on the spot or posted on Federal Business Opportunities no later than June 28, 2023 OBJECTIVES: Contractor shall furnish all supervision, labor, transportation, equipment, materials, supplies, and tools, to accomplish the following: o Contractor shall provide a schedule of completion. o Contractor shall relocate the 3/4 " copper drain line 4" closer to wall for the installation of the new concrete pad. o Contractor shall pour a new 36" wide by 60" length x 6" deep housekeeping concrete pad for the two hot water return pumps. o Contractor shall fabricate all piping and fittings prior to the installation. o Contractor shall relocate the electrical connections to new location. o Contractor shall relocate the existing two Taco hot water return pumps. o Contractor shall remove all compression fittings on the hot water return system in the mechanical room. o Contractor shall remove the two existing 2.5" ball valves. o Contractor shall use copper pipe and fittings type -L on entire hot water return system. o Contractor shall reconfigure all 4" piping to the new pump location. o Contractor shall braze all 4" copper piping and fittings and above. o Contractor shall silver solder all 2 1/2" copper fittings and piping and below. o Contractor shall not use any pro-press fittings on hot water return system o Contractor shall eliminate the (2) 4" butterfly valves on the hot water return line by installing a 4" blind flange on each butterfly valve. o Contractor shall commence the point of connection located above next to the #1 butterfly valve. o Contractor shall re-route and silver solder 3/4" line into the 2.5" return hot water line. o Contractor shall install 2 new 2.5" ball valves. o Contractor shall open all valves and test for water leaks. o Contractor shall start the 2 taco pumps inspect for proper operation.Contractor shall demo the old H6"by W36"by 96" concrete pump pad. o Contractor shall insulate the new piping with 1.5" thick fiberglass insulation and cover with white PVC jacketing. o Contractor shall label the new piping with markers to indicate direction of the water flow. o Contractor shall label and name of hot water supply line and hot water return line. o Contractor shall clean up and dispose of all trash in their working are

Post-Bid

Medical

$250,000.00

Public - Federal

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
118
Bidding Soon
2,156
All Active Projects
1,004
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2023

July 7, 2023

img_map_placeholder

11201 Benton St, Loma Linda, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.