BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Winder, Georgia. Completed plans call for site work for a water / sewer project.

**As of September 14, 2023, this project has not yet been awarded. Award should be going before the city council later this month. The OWNER will evaluate all bids received and award the contract based on bid price and qualifications. The CONTRACTOR selected will be notified in writing by the OWNER. No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) calendar days. Work To Be Done: The Work to be completed for the HWY 53 WATER TREATMENT PLANT EXPANSION is described briefly as follows: In general, construction shall consist of modifying the flow control vault and pre-flash mixer, constructing a new hydraulic flocculator, installing plate settler and sludge collection systems, rehabilitating the filters, constructing a new bulk chemical storage facility and chemical feed improvements, a new backup generator, and other miscellaneous piping, instrumentation, and electrical work. Please contact QuestCDN customer support at 952-233-1632 or info@questcdn.com for assistance in membership registration, downloading and working with digital project information. Any other questions can be directed to the issuing office, ESG Engineering, Inc. Margaret Hildebrand mhildebrand@esgengineering.com or 478-474-4996 ext. 239. Contractor License: Any Contractor submitting a bid must be licensed by the State of Georgia. See Instructions to Bidders for additional bidding requirements Funding: This project is funded by the GEFA Clean Water SRF Program requiring compliance with applicable state and federal bid laws. Reservation of Rights: Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. ESG Engineering Inc. City of Winder Utilities Hwy 42 Water Treatment Plant Expansion (JN21, 28, JU5, 12, 19, 26 B/2725 B/2725) The deadline for questions to 5:00 P.M. on August 3rd, 2023.

Award

Water / Sewer

$18,537,600.00

Public - City

Site Work

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
309
Active Projects
154
Bidding Soon
2,205
All Active Projects
1,011
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 18, 2023

October 17, 2023

June 19, 2025

img_map_placeholder

25 E Midland Ave, Winder, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.