BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 26, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Fargo, North Dakota. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Infrastructure request to facilitate construction of underground utilities, asphalt pavement and incidentals as requested by the Developer. This project is to provide City infrastructure for the development of new residential properties and to connect existing infrastructure. This project also includes; on 25th Street South from 64th Avenue South to 70th Avenue South to construct new sidewalk and shared use paths with curb ramps on the west side of 25th Street. Est. Completion Date: June 28, 2024

Award

Roads / Highways

$1,666,649.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
22
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2023

September 18, 2023

Project location map

Multiple Locations, Fargo, ND

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.