BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 1, 2023 at 8:00 PM

Updated May 31, 2024

Site work for a playground / park / athletic field in Turner Valley, Alberta. Completed plans call for site work for a playground / park / athletic field.

The spray park is located immediately behind the Dr. Lander Memorial Pool in old Turner Valley which is located at 207 Main Street. This site is open to full day sun with only a small amount of natural shade provided by one poplar tree (medium size approximately 25' in height), and one small Lynden tree. The spray pad is orientated North to South by length, or the pool is located immediately West of the amenity. The intention is to provide additional man-made shade that provides maximum coverage. This shade should be provided in a manner that offers maximum protection from the sun's movement through the summer months, preferably from mid to late day. The shade should be provided on the peripheral of the splash pad for users that are resting or picnicking at the splash pad's edge. Any shade option must be durable, capable of withstanding strong winds (upwards of 90kms) and be removable for the winter months. Reference Number: AB-2023-04235 Award: Wild Enterprises Awarded value not released for publication.

Award

Playgrounds / Parks / Athletic Fields

$34,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
18
Bidding Soon
540
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2023

August 14, 2023

Project location map

207 Main St NW, Turner Valley, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.