BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 27, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a civil project in College Station, Texas. Completed plans call for site work for a water / sewer project.

This project will install approximately 3,245 feet of 2-inch force main by open cut, 150 feet of 2- inch force main by trenchless methods, and equal quantities of 4-inch fiber optic conduit parallel to the force main. The project will also install a lift station with electrical components within the existing Carter Lake lagoon site. The contractor will be required to drain, fill, and grade to drain lagoons once off line. Clearing and grubbing near residence home will be required and the contractor will need to coordinate with home owners before clearing adjacent to their property. The force main will begin at the lagoon site north of Carter Lake, extend southwest through an existing City of College Station easement, and tie into an existing manhole near the Cul-de-sac at the end Green Jay Drive This project will install approximately 3,245 feet of 2-inch force main by open cut, 150 feet of 2- inch force main by trechless methods, and equal quantities of 4-inch fiber optic conduit parallel to the force main . The project will also install a lift station with electrical components within the existing Carter Lake lagoon site. The contractor will be required to drain, fill, and grade to drain lagoons once off line. Clearing and grubbing near residence home will be required and the contractor will need to coordinate with home owners before clearing adjectent to their property. The force main will begin at the lagoon site north of Carter Lake, extend southwest through an existing City of College Station easement, and tie into an existing manhole near the Cul-de-sac at the end Green Jay Drive This project will install approximately 3,245 feet of 2-inch force main by open cut, 150 feet of 2- inch force main by trechless methods, and equal quantities of 4-inch fiber optic conduit parallel to the force main . The project will also install a lift station with electrical components within the existing Carter Lake lagoon site. The contractor will be required to drain, fill, and grade to drain lagoons once off line. Clearing and grubbing near residence home will be required and the contractor will need to coordinate with home owners before clearing adjectent to their property. The force main will begin at the lagoon site north of Carter Lake, extend southwest through an existing City of College Station easement, and tie into an existing manhole near the Cul-de-sac at the end Green Jay Drive. Construction of small diameter force main by open cut Construction of small diamter force main by bore Construction of lift stations with with submersible pumps Setup of temperary by-pass pumps Coordination with College Station Water Services. Contractor shall coordinate all work, inspections, and approvals with the City of College Station. Project shall comply with the United States Occupational Safety & Health Administration regulations. Methods & Means of construction shall be compliant with all applicable Federal, State, and Local regulations. This includes obtaining all necessary permits and inspections. Contractor to adhere to City of College Station construction administration procedures including, but not limited to, all plans and specifications. Maintain and submit all project records such as record drawings, project manuals, and warranties for approval by the City of College Station.

Bid Results

Water / Sewer

$1,495,800.00

Public - City

Site Work

36

27

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
221
Bidding Soon
3,385
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2023

September 11, 2023

Project location map

Multiple Locations, College Station, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.