Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in College Station, Texas. Completed plans call for site work for a water / sewer project.
This project will install approximately 3,245 feet of 2-inch force main by open cut, 150 feet of 2- inch force main by trenchless methods, and equal quantities of 4-inch fiber optic conduit parallel to the force main. The project will also install a lift station with electrical components within the existing Carter Lake lagoon site. The contractor will be required to drain, fill, and grade to drain lagoons once off line. Clearing and grubbing near residence home will be required and the contractor will need to coordinate with home owners before clearing adjacent to their property. The force main will begin at the lagoon site north of Carter Lake, extend southwest through an existing City of College Station easement, and tie into an existing manhole near the Cul-de-sac at the end Green Jay Drive This project will install approximately 3,245 feet of 2-inch force main by open cut, 150 feet of 2- inch force main by trechless methods, and equal quantities of 4-inch fiber optic conduit parallel to the force main . The project will also install a lift station with electrical components within the existing Carter Lake lagoon site. The contractor will be required to drain, fill, and grade to drain lagoons once off line. Clearing and grubbing near residence home will be required and the contractor will need to coordinate with home owners before clearing adjectent to their property. The force main will begin at the lagoon site north of Carter Lake, extend southwest through an existing City of College Station easement, and tie into an existing manhole near the Cul-de-sac at the end Green Jay Drive This project will install approximately 3,245 feet of 2-inch force main by open cut, 150 feet of 2- inch force main by trechless methods, and equal quantities of 4-inch fiber optic conduit parallel to the force main . The project will also install a lift station with electrical components within the existing Carter Lake lagoon site. The contractor will be required to drain, fill, and grade to drain lagoons once off line. Clearing and grubbing near residence home will be required and the contractor will need to coordinate with home owners before clearing adjectent to their property. The force main will begin at the lagoon site north of Carter Lake, extend southwest through an existing City of College Station easement, and tie into an existing manhole near the Cul-de-sac at the end Green Jay Drive. Construction of small diameter force main by open cut Construction of small diamter force main by bore Construction of lift stations with with submersible pumps Setup of temperary by-pass pumps Coordination with College Station Water Services. Contractor shall coordinate all work, inspections, and approvals with the City of College Station. Project shall comply with the United States Occupational Safety & Health Administration regulations. Methods & Means of construction shall be compliant with all applicable Federal, State, and Local regulations. This includes obtaining all necessary permits and inspections. Contractor to adhere to City of College Station construction administration procedures including, but not limited to, all plans and specifications. Maintain and submit all project records such as record drawings, project manuals, and warranties for approval by the City of College Station.
Bid Results
Water / Sewer
$1,495,800.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 12, 2023
September 11, 2023
Multiple Locations, College Station, TX
Related To This Project
College Station, TX
--
College Station, TX
Bid Date: Jun 29 2023
College Station, TX
Bid Date: Jul 14 2023
College Station, TX
Bid Date: Aug 29 2023
College Station, TX
--
College Station, TX
--
College Station, TX
--
College Station, TX
Bid Date: Aug 08 2023
College Station, TX
Bid Date: Jul 25 2023
College Station, TX
Bid Date: Jun 29 2023
College Station, TX
Bid Date: Jun 22 2023
College Station, TX
Bid Date: Jul 11 2023
College Station, TX
Bid Date: Jul 13 2023
College Station, TX
Bid Date: Jul 05 2023
College Station, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.