Site work for a water / sewer project in Bassett, Virginia. Completed plans call for site work for a water / sewer project.

PHL Landslide Construction The following is a brief description of the proposed scope of work. Overburden (soil) Removal: Controlled stripping and removal of the overburden overlying bedrock along the face of the slope. Overburden (soil) Regrading: Controlled stripping and regrading of the overburden along the eastern portion of the project area. The regrading and removal of excess overburden reduces the potential of slope failure in that area, preventing damage to the facilities and equipment at the toe. Scaling: Controlled rock scaling along the slope areas to remove loose and unstable rock blocks from the face. Scaling will reduce the likelihood that rockfalls will occur. Concrete T-walls: Pre-cast concrete T-walls should be installed at the toe of the slope and cabled together to prevent rockfall debris from reaching the powerhouse, and hence protect existing structures. Draped Mesh: A draped mesh should be installed along the face of the slope to prevent rockfall debris from reaching the powerhouse area, and hence to protect existing structures. Catchment Fence: Steel cable and wire mesh catchment fence should be erected at the toe of the slope to prevent rockfall debris from reaching the transformer yard and switchgear building, and hence to protect existing structures. Secant Pile Retaining Wall: Construction of a secant pile retaining wall to stabilize the upper access road during the stripping and grading of the overburden on the slope downstream of the right abutment of the dam. Stormwater Detention Vault: Due to the area of disturbance and VADEQ regulations the construction of a detention vault is necessary to limit the increased runoff in the project area due to the stripping and regrading of the soil. In addition to the construction of a detention vault, several new stormwater pipes will be installed, and several other drop inlets and pipes will be replaced to handle the increased runoff on the stripped portion of the slope. Miscellaneous Stormwater Feature : To control and direct stormwater runoff to the detention vault and reduce the likelihood of water running along the upper access road (similar to what transpired during the 2020 slope failures), ditch and cleanout for the upper access road is incorporated into the . Additionally, the replacement of an existing stormwater drop inlet, culvert and headwall to facilitate drainage away from the upper access road ditch is planned. Construction of the Switchgear Building: The building which houses the switchgear equipment was destroyed by the landslide. Once built the new switchgear equipment will be put in place for reconnection of the powerhouse.

Award

Water / Sewer

$19,734,579.00

Public - Federal

Site Work

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
43
Bidding Soon
1,091
All Active Projects
447
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2023

October 16, 2023

img_map_placeholder

To Be Determined, Bassett, VA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.