BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Riverton, Utah. Completed plans call for site work for a water / sewer project.

The project entails the modernization of the Jordan Valley Water Treatment Plant elevator. This elevator underwent an overhaul about 22 years ago, and after continuous service many of its parts have worn and need replacement. Finding replacement parts for the elevator has become increasingly difficult due to the elevator system's obsolescence; which results in prolonged out-of-service periods. At this time, the District desires to modernize the elevator to provide reliable equipment and additional years of service. Completion of work: All work shall be completed on or before 250 days from the Notice to Proceed. Each bid shall be accompanied by a certified or cashier's check, money order or bid bond in the amount of five percent of the total bid price payable to the Jordan Valley Water Conservancy District as a guarantee that the bidder, if its bid is accepted, will promptly execute the contract, provide evidence of worker's compensation insurance, and furnish a satisfactory faithful performance bond in the amount of 100 percent of the total bid price and a payment bond in the amount of 100 percent of the total bid price. The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make awards in the interest of the Owner. Work under this contract includes the modernization of the Jordan Valley Water Treatment Plant elevator located at 15305 South 3200 W, Herriman, UT84065. All questions relative to this project prior to the opening of bids shall be directed to the Engineer for the project. It shall be understood, however, that no interpretations of the specifications will be made by telephone, nor will any "or equal" products be considered for approval prior to award of contract. Engineer VDA, Inc. 50 West Broadway, Suite 300 Salt Lake City, Utah 84101 385-215-8893 Project Manager: Jeffrey Sanders jsanders@vdassoc.com

Award

Water / Sewer

$322,552.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
31
Bidding Soon
524
All Active Projects
253
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

August 21, 2023

img_map_placeholder

15305 S 3200 W, Riverton, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.