BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 29, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a power facility in Mississippi Mills, Ontario. Completed plans call for the renovation of a power facility.

Reference Number 0000250391 Question Acceptance Deadline 2023/08/10 02:00:00 PM EDT Mississippi River Power Corp. (MRPC) owns and operates a 4.6 MW run-of-river hydroelectric generating station in Almonte, Mississippi Mills, Ontario. The generators deliver three-phase energy at 4,160 V to this transformer; the transformer delivers output to the local grid at 44 kV. The new unit must be a one-for-one replacement of the existing unit, both physically and electrically. It is intended to install the new unit in place of the existing unit upon arrival; the existing unit will be kept as a spare. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Power Plant

$500,000.00

Public - City

Renovation

4

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
132
Bidding Soon
1,190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2023

September 18, 2023

Project location map

51 Main St W, Mississippi Mills, ON

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.