BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Newport News, Virginia. Contact the soliciting agency for additional information.

Bellows 1-4 will operate with vacuum inside and one atmospheric pressure differential on the outside. Bellows 1-4 is made of 316L/316LN stainless steel (SS) and welded together with E310/ER/310 welding rods. The vendor is responsible to design and fabricate the bellows, to fabricate their flanges and mechanisms for constraining the bellows, to weld the bellows and their flanges, to assemble the bellows with flanges, and to meet the requirements of leak tests and vacuum tests. The vendor is responsible to conduct vacuum and leak tests before shipping to Jefferson Lab. Jefferson Lab will perform vacuum and leak tests as part of the acceptance criteria for each bellows assembly. Bellows 1 and bellows 2 are identical. Only one set of flanges item A09005- 15-01-0014 and 0016 are to be supplied to TJNAF by the vendor; the knife edges of the bellows without the blind flange shall be properly protected to prevent damage during shipping and handling. The vendor is responsible to develop the leak test fixtures for Bellows 3 and 4; TJNAF will develop its own leak test fixtures for leak testing bellows 3 and bellows 4. The bellows assemblies shall be sufficiently packed to protect their finish and mechanical integrity and to protect against contamination from dirt, water, debris and other contamination during shipping and handling. The vendor may choose either welded or formed bellows. If the bellows are formed, the vendor shall follow the latest ASME Section VIII Division 1, Appendix 26 or EJMA standard to design the bellows and to compute their spring rates and fatigue life. The vendor shall document the computation and provide the calculation document to Jefferson Lab for review prior to fabrication. All bellows that are formed from rolled and welded tubes shall have the tube seam weld planished, if necessary, to assure that failures do not occur at the weld. The MOLLER Experiment is sensitive to the chemical composition of 316L or 316LN. The vendor shall provide material test reports that list the chemical composition. Typical material specifications or certificates are not acceptable. No foreign material, including company name plates, of any type is allowed to be attached to the bellows unless they are explicitly approved by TJNAF. The preferred method of cutting the bellows sheets is to use a saw or a mill (PMAG0000-0100- R0029). If the vendor prepares and cuts the bellows sheet with a shear machine, a small amount of material (>=0.005'') shall be filed away at the cutting edge to reduce magnetic permeability (PMAG0000-0100-R0029). The cutting method of the bellows sheet and whether a small amount of material is filed away shall be recorded in the report of quality inspection. E310/ER310 welding rods shall be used to weld the bellows; however, it is acceptable to weld the longitudinal seams of the bellows without any filler metal. The required documents of welding processes are Welding Procedure Specifications, Procedure Qualification Records, and Welding Performance Qualifications of welders.

Post-Bid

Laboratories

Public - Federal

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
29
Bidding Soon
631
All Active Projects
263
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2023

August 7, 2023

img_map_placeholder

12000 Jefferson Ave, Newport News, VA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.