BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 18, 2023 at 8:00 PM

Updated May 9, 2025

Site work and outdoor lighting for a mixed-use development in Salt Lake City, Utah. Completed plans call for site work for a educational facility; and for outdoor lighting for a educational facility.

Construction Budget: $320,000.00 Bids will be in accordance with the Contract Documents prepared by University of Utah U Facilities, hereinafter referred to as "A/E," as defined in the General Conditions. Scope of Work: LED lighting upgrade for the football practice field behind the Eccles Football Center. Effective September 10, 2018, the University has retired the previous state-mandated Surety Bond Forms and is now requiring the use of the AIA Bid Bond Form A310-2010 and Performance and Payment Bond Form A312-2010.The Bid Form provided herein should only be used for paper bid submittals. Should a bid be received on the Bid Form and electronically through , the electronic bid shall govern. THE UNIVERSITY IS NOT RESPONSIBLE FOR DIFFICULTIES, TECHNICAL OR OTHERWISE, ASSOCIATED WITH THE ELECTRONIC BIDDING PROCESS. BIDDERS WHO CHOOSE TO USE THE ELECTRONIC BIDDING PROCESS DO SO AT THEIR OWN RISK. Persons or companies bidding on this project shall hold a current Utah Contractor's License covering the type of work to be done and shall be bondable to the amount of the Contract. There will be a NO- Mandatory pre-bid meeting . Questions and answers will be included in an addendum.A bid bond in the amount of five percent (5% ) of the bid amount, made payable to The University of Utah, must be procured and submitted to the University of Utah within 24 hours after the bid due time. The bid bond may be scanned and submitted with the online bid . Construction Constraints : This job needs to be completed by July 31, 2023, 5:00 p.m. MT. The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University. Q & A deadline: Jun 28, 2023 6:00:00 PM EDT *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Award

Playgrounds / Parks / Athletic Fields

$372,960.00

Public - State/Provincial

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
64
Bidding Soon
1,055
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 3, 2023

July 10, 2023

Project location map

592 Guardsman Way, Salt Lake City, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.