BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Afton, Oklahoma. Completed plans call for site work for a road / highway.

The Miami Special Utility Authority (''MSUA'') is seeking SEALED, FORMAL BIDS, for the relocation of one 13.2kV distribution line section identified in the bid specifications. The work shall include furnishing all labor, material (except items supplied by the Owner as specified in these Specifications and Contract Documents), supervision, equipment and tools to construct new overhead power lines as shown on the plans and described in these specifications. Owner will supply poles, crossarms, conductor, guys and anchors and all major equipment for the project, contractor may have to supply some minor material. The project shall be measured and paid for by the individual sections completed and accepted by the MSUA. Quotes will be for completion of said project which will consist of pole, conductor, and associated equipment install, removal, and transfer as noted on drawings used for reference only. The proposals filed with the MSUA shall be accompanied by a Bidder's Bond or Certified Cashier's Check for five Percent (5%) of the total amount of the bid, payable to the MSUA. The following bonds will be required from the Successful Bidder: o Performance Bond in the Full Amount of the Contract Price o Payment Bond for payment of all labor and materials used in the construction of such Improvements in the Full Amount of the Contract Price o One year Maintenance Bond in the Full Amount of the Contract Price The bidder (Proposer) must supply all the information required by the bid or proposal forms. 1. Bid Proposal and Quote Form 2. Qualification Statement 3. Bidder's Response Sheet 4. Non-collusion affidavit 5. Bid Bond/Cashier Check for 5% of total bid. 6. Authorization to Release Information Additional work may be added to this contract via a change order if agreed upon by the MSUA and Contractor to the extent allowed by law. The change order must be approved in writing before work has been started. Each Contractor shall possess State and local licenses as are required by law, and shall furnish satisfactory proof to the MSUA upon request that the licenses are in effect during the entire period of the contract. All applicable laws, ordinances, rules, and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout

Post-Bid

Roads / Highways

$700,000.00

Public - City

Site Work

20

10

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
77
Active Projects
44
Bidding Soon
734
All Active Projects
277
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2023

August 17, 2023

img_map_placeholder

S 520 Rd, Afton, OK

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.