Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Enfield, Connecticut. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; sidewalk / parking lot; and sidewalk / parking lot.
Certification of Nonsegregated Facilities - (Applicable to federally assisted construction Contracts and related Subcontracts exceeding $10,000 which are not exempt from the Equal Opportunity Clause). The federally assisted construction CONTRACTOR certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments, and that he does not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. The federally assisted construction CONTRACTOR certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. The federally assisted construction CONTRACTOR agrees that a breach of this certification is a violation of the Equal Opportunity clause in this Contract. As used in this certification, the term "segregated facilities" means any waiting rooms, work areas, rest rooms and wash rooms, or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national origin, because of habit, local custom, or otherwise. The federally assisted construction CONTRACTOR agrees that (except where he has obtained identical certifications from proposed Subcontractors for specific time periods) he will obtain identical certifications from proposed Subcontractors prior to the award of Subcontracts exceeding $10,000 which are not exempt from the provisions of the Equal Opportunity clause, and that he will retain such certifications in his files. Abandonment of existing asbestos cement and cast-iron water mains in place and installation of approximately 5,800 linear feet of new water main, hydrants, services, curb boxes, appurtenances, earthwork, pavement, sidewalk replacements and site restoration. The work is split into a base bid and bid alternate. A. Contractor is required to work in close proximity to Owner's existing facilities. The Contractor, under this Contract, will be responsible for coordinating construction activities with Owner to ensure that services, facilities, and safe working conditions are maintained. B. Other Construction Contractors will be interfacing with this Contract and working within the work area and in the vicinity of this Contract. The Contractor, under this contract, shall act as Construction Coordinator and shall coordinate construction activities with other Contractors working for Owner. C. Any damage to existing structures, equipment and property, accepted equipment or structures, and property or work in progress by others; as a result of the Contractor's or their subcontractor's operations shall be made good by the Contractor at no additional cost to the Owner. A. Work Included: Within ten (10) days after the effective date of the Agreement between Owner and Contractor submit to the Engineer an estimated progressschedule as specified herein. B. Form of Schedules: 1. Narrative: Completely describe the construction methods to be employed. 2. Network Analysis System: a. Provide a separate horizontal schedule line for each trade or operation and show concurrent and preceding activities. b. Present in chronological order the beginning of each trade or operation showing duration and float time. c. Scale: Identify key dates and allow space for updating and revision. 3. Mathematical Analysis: a. A mathematical analysis shall accompany the network diagram. A computer printout will be acceptable. b. Information shall be included on activity numbers, duration, early start, late start, etc. and float times.
Bid Results
Water / Sewer
$860,393.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 6, 2023
August 7, 2023
Multiple Locations, Enfield, CT
Related To This Project
Enfield, CT
--
Enfield, CT
Bid Date: Aug 10 2023
Enfield, CT
--
Enfield, CT
Bid Date: Aug 04 2023
Enfield, CT
--
Enfield, CT
--
Enfield, CT
Bid Date: Aug 30 2023
Enfield, CT
Bid Date: Sep 12 2023
Enfield, CT
--
Enfield, CT
Bid Date: Jun 07 2023
Enfield, CT
Bid Date: Jun 28 2023
Enfield, CT
Bid Date: Jul 06 2023
Enfield, CT
Bid Date: May 31 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.