Renovation of a medical facility in Moreno Valley, California. Completed plans call for the renovation of a 2,460-square-foot medical facility.

Riverside University Health System Medical Center EleThe Project to be constructed generally consists of the following: Modernization of elevators P1, P2, P4, P5, S1, S2 and S3 and installation of a new elevator, P3, in an existing empty shaft. Replacement of hoist equipment and controllers, along with a new remote monitoring system and interior finishes are also included. The identifying name of the Project is Riverside University Health System Elevator Modernization. Elevator Modernization. Project Location: 26520 Cactus Ave, Moreno Valley, CA 92555. Substantial Completion of the Work must be achieved within One Thousand and Sixty Six (1,066) Calendar Days from the Date of Commencement. Final Completion must be achieved within Thirty (30) Days after the occurrence of Substantial Completion. The Construction Contract includes provisions: (1) permitting the County to assess liquidated damages to the Contractor of $500.00 per Day for each Day after the expiration of the Contract Time for Substantial Completion that the Work is not Substantially Completed by Contractor; and (2) for payment by County to Contractor of liquidated damages to Contractor of $500.00 per Day for each Day of Compensable Delay for which Contractor is entitled to a Contract Adjustment of the Contract Time and Contract Price. The Bidder to whom the Construction Contract for the Work is Awarded by the County is required, both at the time of the Bid Closing Deadline and at the time of Award The County reserves the right to postpone the Bid Closing Deadline by issuance of an Addendum to the Bidding Documents at any time prior to the Bid Closing Deadline. 1. MODERNIZATION OF ELEVATORS P1, P2, P4 & P5, S1, S2 & S3. 2. HOIST EQUIPMENT REPLACEMENT TO ELEVATORS P1, P2, P4, P5, S1 S2 & S3 IN MACHINE ROOM. 3. REPLACEMENT OF CONTROLLERS IN MACHINE ROOMS FOR P1, P2, P4, P5, S1, S2 & S3. 4. NEW REMOTE MONITORING SYSTEM. 5. NEW CABIN FINISHES. REFINISH ELEVATOR CABS.

Award

Medical

$6,686,000.00

Public - County

Renovation

94

24

4

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
92
Bidding Soon
2,122
All Active Projects
937
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

September 19, 2024

img_map_placeholder

26520 Cactus Ave, Moreno Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.