Site work for a bridge / tunnel in Farmington, Maine. Completed plans call for site work for a bridge / tunnel.

Shoulder/ Ditching Specifications: o Shoulder width will be maintained and repair any damage from water erosion. o Shoulders will be lower and graded at a slightly steeper cross slope to provide positive drainage to the ditch. o If possible, the all-in slopes will be no steeper than 2:1 and the back slopes will be no steeper than 1:1. o The depth of the ditch should be a minimum of 12" to 18" below the gravel base or follow the original ditch depth when constructed to maintain water flow to existing cross culverts and for water cutouts. o The width of the bottom of the ditch will be 18" wide between the front slope and back slope and v-ditch should be avoided. o No gravel of sod berm or windrow will be left in between the road and the ditch slope. o The county will give the contractor places for ditch spoils. o All culverts, geotextiles, and erosion control materials will be supplied by the County; however the contractor will pick up the material at County Way campus. o Avoid any inconveniences to residents without prior notice given to them. o The contractor will use proper warning signs in and around the work area and only close one lane at a time during construction. o All unstable ditches and slopes will be properly protected against erosion according to best management practices and the contractor must be certified in that practice. Any exposed soil shall be stabilized with hay mulch at the end of the workday. o All work will be performed under the direction of the Road Supervisor. o All culverts or obstructions contractor will mark before work begins. o The contractor will call Dig Safe before any work begins and provide the county with the dig safe permit number. o A machine must have a hydraulic ditching bucket and not be any larger than a 23-ton excavator and no smaller than an 18-ton Excavator. The contractor shall avoid sharp turns on the hot top and avoid damage to the surface. Franklin County reserves the right to reject any and/or all bids for any reason.

Award

Bridges / Tunnels

$165,987.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
12
Bidding Soon
298
All Active Projects
119
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2023

August 10, 2023

img_map_placeholder

Multiple Locations, Farmington, ME


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.