BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Anaheim, California. Completed plans call for site work for a municipal facility.

The work to be undertaken at 233 E Center Street consists of installation of a new 300Kva transformer, new meter panels, new AC disconnect, 9 new ChargePoint chargers, new conduit runs and fittings, new outlets, new electrical service, power, switching, distribution system for all new and existing services, new bollards, striping, new signs, new wheel stops, new detectable warning surfaces, tree removal, new concrete slabs and subbase. The work at 1150 N. Kraemer includes installing 6 new Charge Point chargers and all appurtenant work (see project plans). Project locations: 233 E. Center St. and 1150 N. Kraemer Blvd. Start/Delivery Date: Estimated September 2023 Project Duration:50 working days. License Requirements: C-10 The City reserves the right to reject any and all bids, or waive any informalities, irregularities or technicalities. A bid protest shall specify the reasons and facts upon which the protest is based and shall be in writing and received by the City Clerks Office and an electronic copy to the project Contract Administrator no later than five (5) calendar days after bid opening date. Account No. 525-521-6276-7075-2000851-01 BLD2020-02686 and 2022-02631 Question Deadline 07/20/2023 at 12:00 PM PT The scope of work includes, but is not limited to the following: 1. SITE WORK: provide new concrete pad for new 400a main service & new transformer and bollards. removal of one tree and relocation of landscape sprinklers to irrigate away from MSA. 2. LEVEL 1: provide a new electrical 'MSA' service over new concrete pad and new bollards outside of structure on alley side with new conduit from MSA to new EV electrical panel at 3rd level to connect all EVCS & outlets. Limited voluntary access compliance at selected ADA parking stalls. New pavement replacement for slope correction and new detectable warning. new re-striping, and new signage. In addition, 1 new dual EVC station to service the new accessible EVC stations (van accessible and car accessible) provided at 1st level only) to include new signage. 3. LEVEL 2: Disconnect and re-connect existing EV Charging Stations to new EV electrical panel. 4. LEVEL 3 & 4: New 4 dual EV charging stations and 1 outlet at each level. 5. THERE WILL BE NO INCREASE IN PARKING COUNT. 6. THERE IS NO CHANGE TO THE BUILDING EXISTING OCCUPANCY OR USE

Award

Municipal

$594,687.00

Public - City

Site Work

27

19

2

7

Subscribe For Documents

93 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
225
Active Projects
111
Bidding Soon
2,336
All Active Projects
921
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 27, 2023

September 1, 2023

img_map_placeholder

Multiple Locations, Anaheim, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.