BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a playground / park / athletic field in Marion, South Carolina. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

As of 7/12/2024, the owner has selected a Design Builder. Project is already underway, with an estimated completion date by the end of August. The City of Marion is requesting proposals for the design-build construction of a new 18x40 restroom/concession building at the Green Street Sports Complex in Marion, SC. Equal Opportunity Employer. Project Location: South Main and Green Street, Marion SC 29571 *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. 18x40 Restroom/Concessions Building AC/Heater for Restrooms and Concessions Restrooms Men Women 2- urinals 1- toilet 2- toilets 1- sink 1- sink 1- hand dryer 1- hand dryer 1- baby changing station 1- baby changing station 1- exhaust fan 1- exhaust fan 1- lighting and outlet 1- lighting and outlet 1 -divider for toilet 1- divider for toilet 1- 36in metal door 1- 36in metal door Concessions Storage Room 1- 8ftx 42inch serving window 1- mop sink 1- roll down door for serving window 1- electrical lighting and outlets 1- 36in metal door 1- 36in metal door 1- electrical and lighting 520-amp 120-volt circuit 1- 36in sink Exterior 1- 20ft of countertops Masonry cut block 1- 10ft of open shelving Metal standing seam 1- ice machine hook-up Vinyl and metal soft lift The successful bidder will be required to submit an engineered drawing for the restroom/concession building.

Under Construction

Playgrounds / Parks / Athletic Fields

$194,840.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
57
Bidding Soon
438
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2024

July 12, 2024

img_map_placeholder

1218 S Main St, Marion, SC

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.