BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Aurora, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project shall consist of making improvements to the existing streets to include city wide projects for Sidewalk Removal and Replacement, Patching, 3, and Thermoplastic & Modified Urethane Pavement Markings. The Engineer reserves the right to alter the plans, extend or shorten the improvement, add such work as may be necessary, and increase or decrease the quantities of work to be performed all in accordance with Section 104 of the Standard Specifications. The difference in quantities regardless of the percent increase or decrease shall be deemed to pose no significant change in the character of the work for this contract. All quantities are estimated, and payment will made for actual measured work completed. Contractor shall note that projects are city wide and will be small quantities at each location as shown on the List included All questions must be received by 2:00 pm (CST) on Wednesday July 5, 2023. A response to all questions received will be posted on the Citys website via addendum by 5:00 pm (CST) on Friday July 7, 2023 City-Wide Sidewalk, Patching, Striping, and Bike Path Overlay' Approximate quantities of work to include Sidewalk Removal and Replacement (39,893 SQ FT), Earth Excavation (160 CU YD), Patching (8,735 SQ YD), HMA Surface Course (498 TONS) and Base Course (72 TONS), Thermoplastic Pavement Marking (150,000 FT) with intermittent grooving, Modified Urethane Pavement Marking (5,000 FT), and other related items. Prequalification of Bidders is required for this project. The 2 low bidders must file within 24 hours after the letting an "Affidavit of Availability" (Form BC 57), showing all uncompleted contracts awarded to them and all low bids pending award. Any bidder who owes the City money may be disqualified at the City's discretion The City encourages minority business firms to submit proposals and encourages the successful contract bidder to utilize minority businesses as subcontractors for supplies, equipment, services, and construction. The City of Aurora has a local preference ordinance that would apply to this contract.

Award

Sidewalks / Parking Lot

$1,565,556.00

Public - City

Paving, Site Work

27

9

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
172
Active Projects
91
Bidding Soon
1,752
All Active Projects
761
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 12, 2023

August 14, 2023

img_map_placeholder

Multiple Locations, Aurora, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.