Published August 23, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a sidewalk / parking lot in Macomb, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000323421 The 2023 Pathway Gap Closure Program project consists of constructing new 8-foot-wide pathway to fill in gaps at twelve locations in Macomb Township: 25 Mile Road (between Romeo Plank Road north of 25 Mile Road and Romeo Plank Road south of 25 Mile Road); 25 Mile Road (between Romeo Plank Road south of 25 Mile Road and Luchtman Road); Romeo Plank Road (just south of 25 Mile Road); Romeo Plank Road (between 25 Mile Road and 24 Mile Road); 22 Mile Road (just west of Card Road); Card Road (between 22 Mile Road and Ambassador Drive); Card Road at 22 Mile Road; Card Road (just north of 22 Mile Road); 22 Mile Road (between Briar Pointe Drive and Morning Glory Drive); 22 Mile Road (between Shenandoah Drive and Briar Pointe Drive); 22 Mile Road (between Wingfield Boulevard and Monarch Drive); and Card Road (between Antrim Dells Boulevard and Homestead Drive). The work includes approximately 22,000 square feet of 4-inch pathway, 8,000 square feet of 6-inch pathway, 200 square feet of 6-inch pathway ramps, and other miscellaneous items, in accordance with the Bidding Documents prepared by the ENGINEER. This project will be evaluated on a qualification-based selection process. Each proposal will be evaluated and scored based on its price, workplan, staff experience, and schedule. As such, proposal prices will not be read at bid opening. Various locations within Macomb Township Question Acceptance Deadline 07/18/2023 02:00 PM EDT Questions are submitted online Yes All questions shall be directed to Janet Solomon, Purchasing Specialist, at Macomb Township, at solomonj@macomb-mi.gov, no later than seven (7) calendar days prior to bid opening. Each bid shall be accompanied by a certified check or bank draft in the amount of 5% of the total amount bid, payable without condition to the Township of Macomb as security for the acceptance of this contract.A bid bond in the amount of 5% of the total amount bid issued by an approved Surety Company and executed by the bidder, may be furnished in lieu of a certified check. General Requirements - Bid Deposit - Insurance Award Requirements - All or None Award The OWNER reserves the right to accept any bid, to reject any or all bids, to waive defects in the bids, and to make the award as may appear to be to the best interest of the OWNER.

Award

Sidewalks / Parking Lot

$300,000.00

Public - City

Paving, Site Work

44

17

4

6

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Project Management and Coordination, Construction Progress Documentation, Survey and Layout Data, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures, Temporary Fencing, Project Identification, Temporary Project Signage, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Rough Grading, Finish Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Pruning, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Irrigation, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Sodding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Service Connections, Sanitary Sewerage Utilities, Storm Drainage Utilities, Culverts
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
90
Bidding Soon
1,500
All Active Projects
626
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2023

August 24, 2023

img_map_placeholder

Multiple Locations, Macomb, MI

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2023 Pathway Gap Closure Program

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.