BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a water / sewer project in Novato, California. Completed plans call for the renovation of a water / sewer project.

In accordance with Drawings and Specifications prepared by Woodard & Curran, the Work includes furnishing of all labor, materials, tax, equipment, incidentals and services for the construction and completion of the Primary Clarifier No. 2 Protective Coating ("Project"). The Work includes but is not limited to cleaning, preparation and the application of a new coating on the metal surfaces of the mechanism and bare concrete surfaces of the scum pit of the Primary Clarifier No. 2 at the Novato Wastewater Treatment Plant Inquiries must be submitted via electronic telecommunication (e-mail) to: Erik Brown erikb@novatosan.com The Contract Time for the completion of all the Work of the Project is 70 (seventy) Calendar Days. Each Bid must also be accompanied by security in the form of a Bidder's Bond issued by a corporate surety, a certified check, or cashier's check payable to the District, or cash for an amount not less than ten percent (10%) of the Total Bid Price. The successful Bidder shall be required to execute a Material and Labor Payment Bond and Performance Bond, issued by a corporate surety, in conformance with the requirements set forth in the Contract Documents, each for not less than one hundred percent (100%) of the Contract Price Inquiries regarding further information about the Project may be directed to Erik Brown, Deputy General Manager, at erikb@novatosan.com The District reserves the right to award the Contract, to reject any or all Bids, to waive non-material and inconsequential irregularities in any Bid, and to reject nonconforming, nonresponsive, nonresponsible, or conditional Bids. No Bid received and read aloud may be withdrawn for a period of thirty (30) days after the bid opening date, except pursuant to California Public Contract The estimated cost for this work is: $270,000.

Award

Water / Sewer

$235,378.00

Public - City

Renovation

9

11

2

4

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
78
Bidding Soon
1,723
All Active Projects
719
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2023

August 28, 2023

img_map_placeholder

To Be Determined, Novato, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.