BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Jersey City, New Jersey. Completed plans call for site work for a playground / park / athletic field.

PAVONIA MARION PARK RENOVATION PROJECT NO. 2019-038 Proposals MUST BE ACCOMPANIED by a Bid Bond or Certified Check, made payable to the City of Jersey City, in an amount equal to Ten (10%) percent of the Bid not to exceed $20,000.00. ONLINE BID RECEPTIONS/PURCHASING LOCKBOX In an effort to adhere to social distancing protocols and best practices, all bid receptions are held virtually as video conferences with public access. Questions by prospective bidders concerning this bid must be done on-line. The Purchasing Agent reserves the right to reject any and all bids received, or portions thereof, if deemed to be in the best interest of the City to do so. SCOPE OF WORK A. The work of this section shall include all necessary labor, materials, tools and appliances required to complete, in a first quality, workmanlike manner, the work as specified in this section and as shown on the drawings. B. The contractor shall perform all work, furnish all materials and install all measures required to reasonably control soil erosion resulting from construction operations and prevent excessive flow of sediment from the construction site. Such work may include the installation of water diversion structures, and seeding, mulching or sodding critical areas to provide temporary protection. The contractor shall review the details attached at the end of this section for controlling erosion during construction. When no work will be performed on critical areas for more than 30 days, they shall be protected by temporary seeding, mulching, or sodding. C. Permanent soil protection, streets and drainage facilities should be completed as early as practicable, particularly intercepting channels and similar controls that will divert runoff from unprotected soil. The area of exposed soil and the length of exposure should be minimized by proper scheduling. Temporary protection such as fiber mats, plastic, straw and fast-growing grasses may be required. Partially completed drainage structures should be inspected carefully during construction to prevent erosion. D. The permanent restoration of vegetative cover such as seeding or sodding on all areas shall be accomplished within 10 days after final grading operations have been completed. Time extensions beyond the 10 days requirement may be requested in writing and are subject to written approval by the Architect. E. Seeding, mulching and sodding of critical area shall be in accordance with the attached vegetative standards. F. The contractor shall comply with applicable State and local regulations regulating to the prevention and abatement of pollution. G. The contractor shall protect existing trees from environmental and mechanical injury in areas affected by the construction work under this contract. Question Deadline 06/18/2024 at 4:00 PM ET

Award

Playgrounds / Parks / Athletic Fields

$1,622,844.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
965
Active Projects
561
Bidding Soon
7,538
All Active Projects
3,143
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 25, 2024

July 25, 2024

img_map_placeholder

1040 West Side Ave, Jersey City, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.