BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2023 at 8:00 PM

Updated January 26, 2024

Site work and new construction of an educational facility in Richardson, Texas. Completed plans call for the construction of a 125,000-square-foot educational facility; and for site work for a educational facility.

The Naveen Jindal School of Management Phase III project will provide +/-125,000 GSF of new construction which will build upon the success of the Jindal School of Management in order to support the growing student enrollment. Programmatic spaces will include classrooms, faculty offices, meeting rooms, student flex space and study areas, testing area, and dedicated spaces to support the many School of Management student activities and programs. An outdoor private event space will be needed to serve faculty and staff. Supporting spaces for the new facility include but are not limited to restrooms, passenger/service elevators, building storage, mechanical, electrical, telecom / server rooms, and janitorial services. Selective demolition of existing building tie-in locations, utilities, landscaping and paving is to be expected to make way for the new construction. Exterior improvements will include landscaping, irrigation, bicycle storage, lighting, sidewalks, and cross walks. Infrastructure improvements are anticipated to include telecom and electrical duct banks, manholes, utility vaults, natural gas distribution, potable water supply, sanitary sewer, fire lines and hydrants, storm water management and chilled water supply/return which will tie-in to existing Campus infrastructure. The project will also include a site utilization analysis to demonstrate future expansions and phasing of the planned new facility and adjacent facilities as well as utility and pedestrian connectivity. The design team selected for this project is expected to work with numerous stakeholders on a recurring basis. The Preliminary Project Cost (PPC) for Phase III of this new construction project is $98,000,000. The PPC includes a Construction Cost Limitation (CCL) for the Architect/Engineer of $75,690,000 for the new construction. A minimum of Ten Percent (10%) of the CCL is dedicated to design alternates. Advanced "Make Ready" packages should be expected to be issued by the Architect/Engineer immediately after execution of a Guaranteed Maximum Price (GMP) with the Construction Manager at Risk. Anticipated Issue for Construction "Make Ready" packages include abatement and demolition, site preparation, infrastructure improvements and below grade/at grade structural systems. All remaining Issue for Construction Documents will be referenced as "Project Completion". Fees, furnishings, equipment, other work, miscellaneous expenses, and contingencies make up the balance of the PPC.

Post-Bid

Educational

$98,000,000.00

Public - State/Provincial

New Construction, Site Work

30

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
412
Active Projects
198
Bidding Soon
3,973
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 23, 2023

October 22, 2024

Project location map

800 W Campbell Rd, Richardson, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.