Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of an educational facility in Richardson, Texas. Completed plans call for the construction of a 125,000-square-foot educational facility; and for site work for a educational facility.
The Naveen Jindal School of Management Phase III project will provide +/-125,000 GSF of new construction which will build upon the success of the Jindal School of Management in order to support the growing student enrollment. Programmatic spaces will include classrooms, faculty offices, meeting rooms, student flex space and study areas, testing area, and dedicated spaces to support the many School of Management student activities and programs. An outdoor private event space will be needed to serve faculty and staff. Supporting spaces for the new facility include but are not limited to restrooms, passenger/service elevators, building storage, mechanical, electrical, telecom / server rooms, and janitorial services. Selective demolition of existing building tie-in locations, utilities, landscaping and paving is to be expected to make way for the new construction. Exterior improvements will include landscaping, irrigation, bicycle storage, lighting, sidewalks, and cross walks. Infrastructure improvements are anticipated to include telecom and electrical duct banks, manholes, utility vaults, natural gas distribution, potable water supply, sanitary sewer, fire lines and hydrants, storm water management and chilled water supply/return which will tie-in to existing Campus infrastructure. The project will also include a site utilization analysis to demonstrate future expansions and phasing of the planned new facility and adjacent facilities as well as utility and pedestrian connectivity. The design team selected for this project is expected to work with numerous stakeholders on a recurring basis. The Preliminary Project Cost (PPC) for Phase III of this new construction project is $98,000,000. The PPC includes a Construction Cost Limitation (CCL) for the Architect/Engineer of $75,690,000 for the new construction. A minimum of Ten Percent (10%) of the CCL is dedicated to design alternates. Advanced "Make Ready" packages should be expected to be issued by the Architect/Engineer immediately after execution of a Guaranteed Maximum Price (GMP) with the Construction Manager at Risk. Anticipated Issue for Construction "Make Ready" packages include abatement and demolition, site preparation, infrastructure improvements and below grade/at grade structural systems. All remaining Issue for Construction Documents will be referenced as "Project Completion". Fees, furnishings, equipment, other work, miscellaneous expenses, and contingencies make up the balance of the PPC.
Post-Bid
Educational
$98,000,000.00
Public - State/Provincial
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 23, 2023
October 22, 2024
800 W Campbell Rd, Richardson, TX
Related To This Project
Richardson, TX
Bid Date: Jul 27 2023
Richardson, TX
--
Richardson, TX
Bid Date: Jul 18 2023
Richardson, TX
--
Richardson, TX
Bid Date: Aug 01 2023
Richardson, TX
--
Richardson, TX
Bid Date: Aug 09 2023
Richardson, TX
--
Richardson, TX
Bid Date: Jul 20 2023
Richardson, TX
--
Richardson, TX
Bid Date: Jul 28 2023
Richardson, TX
Bid Date: Jul 26 2023
Richardson, TX
--
Richardson, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.