Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 15, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a bridge / tunnel in Seven Hills, Ohio. Completed plans call for site work for a bridge / tunnel.
the 1630-Hemlock Creek Bank Stabilization in Seven Hills Phase I. In general, the work shall consist of furnishing all labor, materials, equipment, and incidentals for construction of the following work: o The Hemlock Creek Bank Stabilization project will shift the alignment of Hemlock Creek and expand the floodplain to the NEORSD acquired properties. The streambed will be shifted to the NEORSD properties and raised vertically to reduce the average gradient. The project will remove the existing culverts crossing Forest Overlook Dr. and Donna Rae Dr. and replace them with two new 16' W x 4' H culverts. The new culverts are configured to allow for maximum culvert conveyance efficiency to maximize the ability to restore the new stream channel. Raising the stream bed will require three drops within the system. The first drop will be just upstream of the Forest Overlook Culvert, the second drop is upstream of the Donna Rae Culvert and a third drop is immediately downstream of the Donna Rae Culvert. The NEORSD reserves the right to reject any and all Bids, to waive any informalities or irregularities in the Bids received. Bidders shall review the Instructions to Bids and all other contract documents prior to submitting a bid for this project All questions regarding the Contract Documents shall be directed to the Project Manager for the NEORSD, Derek Vogel at (216) 881-6600 or e-mail vogeld@NEORSD.org. The Engineer's Estimate for the 1630-Hemlock Creek Bank Stabilization in Seven Hills Phase I is $3,579,000.00
Award
Bridges / Tunnels
$3,180,470.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2023
September 25, 2023
Multiple Locations, Seven Hills, OH
Related To This Project
Seven Hills, OH
--
Seven Hills, OH
Bid Date: Sep 28 2023
Seven Hills, OH
Bid Date: Mar 14 2022
Seven Hills, OH
--
Seven Hills, OH
--
Seven Hills, OH
Bid Date: Apr 24 2025
Seven Hills, OH
Bid Date: Jun 27 2025
Seven Hills, OH
Bid Date: Jun 24 2025
Seven Hills, OH
--
Seven Hills, OH
Bid Date: Mar 10 2023
Seven Hills, OH
Bid Date: Mar 24 2023
Seven Hills, OH
Bid Date: Feb 09 2023
Seven Hills, OH
Bid Date: Feb 03 2023
Seven Hills, OH
--
Seven Hills, OH
Bid Date: Jun 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
