BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 6, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work and addition to a laboratory facility in Brandon, Manitoba. Completed plans call for the addition of a 1,000-square-foot, one-story above grade laboratory facility; for the demolition of a laboratory facility; and for site work for a laboratory facility.

The work to be performed under this specification shall consist of all necessary professional engineering and design services, management, labour, supervision, materials, plant, tools, transportation, and warranty of workmanship and materials, including all reasonable incidentals necessary for the complete addition to an existing lab facility located at the Manitoba Transportation and Infrastructure Yard, 1525 1st Street North, Brandon, MB. Question Acceptance Deadline: 2023/07/11 05:00:00 PM EDT Questions are submitted online: No Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Laboratories

$250,000.00

Public - State/Provincial

Addition, Demolition, Site Work

18

6

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
4
Bidding Soon
126
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 13, 2023

August 11, 2023

Project location map

1525 1st St N, Brandon, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.