BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, renovation and addition to a mixed-use development in Detroit, Michigan. Completed plans call for site work for a 17,766-square-foot, two-story above grade educational facility; for the addition of a educational facility; for the demolition of a educational facility; and for the renovation of a educational facility.

Oakland International Academy is seeking sealed bids for General Contractor services on a construction project for a 2-story, 17,766 square foot addition to the middle school building located at 8228 Conant Street. 1) Two story sprinkled addition 2) First story: 8,883 sq. ft. 3) Second story: 8,883 sq. ft. 4) Total additional square footage: 17,766 sq. ft. 5) Masonry Construction a. Brick on 8" block b. New brick veneer to match patterning and intent of existing structure c. Rigid insulation between brick air=space and block 6) Limited gypsum board on metal stud construction for some non-classroom function rooms 7) Addition Finishes to match existing finishes, dependent upon owner approval 8) (16) sixteen classrooms, (8) eight per floor 9) (2) two boys and (2) girls bathrooms, (3) three fixtures (sinks & water closets), (1) one per floor 10) (1) one elevator 11) (2) two stair towers 12) (1) teachers Lounge and Teacher's Restroom on second floor 13) Storage, Mechanical and electrical rooms Throughout 14) Mechanical a. (4) Four 12.5 ton units b. (2) Two 4 ton units c. System for addition independent of existing building d. Roof conductors and drains, feed directly to storm e. (2) two water heaters in Mechanical room first floor 15) Electrical a. New electric service to tie into existing service at Main Distribution Panel b. Each floor to have panels for floor c. System for addition independent of existing building 16) Plumbing a. New sanitary lead to tie into existing, contractor to verify exact size, location and flow of direction b. Hi-lo water fountain on each floor c. Service sink on second floor d. Fridge and sink in Teacher's Lounge e. Sprinkler line, domestic line and gas point of entry in Mechanical room (first floor) 17) Fire Alarm a. Per NFPA and Fire Alarm System Manufacturer. 18) Civil a. Site b. Landscape Work is to commence on August 7, 2023. Proposal must include a project timeline with completion by July 1, 2024 and a secured Certificate of Occupancy.

Award

Educational

$3,993,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
85
Bidding Soon
1,551
All Active Projects
630
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2023

October 2, 2023

img_map_placeholder

8228 Conant, Detroit, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.