BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Millersville, Maryland. Working plans call for the renovation of a educational facility.

Construction with Installation Floater Bid Deposit Required: 5% of Bid Price Payment and Performance Bonds Required: 100% of Bid Price QUESTIONS DUE DATE AND TIME: July 18, 2023 12:00 Noon Questions must be received by the date and time noted above via email to: Dave Pyle at dpyle@harford.edu SCOPE OF WORK AND SPECIFICATIONS This project involves the removal and disposal of existing air-cooled chiller at the Student Center. Replacement shall be with equipment similar to existing 330T York model YCAS0330C46. The current unit has R-22 refrigerant and must be properly disposed of. Contractor will be responsible for all labor and materials required to remove and install the new chiller and connect all required items to chiller in existing location on pad. Any request for replacing the chiller with an approved equal shall be submitted before or by the solicitation question due date. No request for "approved equals" will be accepted after the solicitation questions due date of July 18, 2023. Project "construction" cannot begin prior to October 30, 2023 and shall be completed no later than March 31, 2024. Liquidated Damages will be assessed at $350.00 per day beyond the completion date or March 31, 2024, whichever date is the earliest. Bids submitted with completion dates beyond the March 31, 2024 date shall be rejected. A. The Campus will be in operation during the construction period. The selected firm shall provide traffic control at all times and insure a safe working environment. Project sites shall be kept clean, neat and organized. All work sites shall beenclosed in orange plastic safety fence. It is the Contractor's responsibility for removal and replacement of signs to facilitate work. Restoration of any damage to the College's property (buildings/grounds) will be the Contractor's responsibility. B. Mobilization, set up of contractor equipment, parking, dumpsters etc. shall be coordinated with the College's representative at the pre-construction meeting. C. The Contractor shall: 1. Provide a 24-hour emergency contact phone number. 2. Provide a project schedule at the pre-constructionmeeting. 3. A qualified, English-language speaking superintendent on the project premises at all times. Any change in supervision shall be communicated to the College's Project Manager immediately. 4. Attend progress meetings during the course of theproject. 5. Any RFI's or issues shall immediately be brought to the attention of the College's Project Manager. 6. A two-year (2) Contractor's workmanship warranty to the College priorto final payment that shall cover any issues resulting from the construction. 7. Any required equipment training shall be scheduled and provided by the contractor prior to final acceptance.

Final Planning

Educational

$400,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
494
Active Projects
263
Bidding Soon
3,809
All Active Projects
1,533
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 28, 2023

October 30, 2023

March 31, 2024

img_map_placeholder

Multiple Locations, Millersville, MD

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.