Site work and paving for a sidewalk / parking lot in Lewiston, Maine. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work for the VALE STREET SIDEWALK IMPROVEMENTS shall consist of, but not be limited to, furnishing and installing (except as noted) all materials labor and equipment necessary to resurface or rehabilitate streets or roads as listed, including utility cover adjustments: water gate box lowering and raising, tack coat, shim, and overlay; driveway preparation and lawn and driveway restoration; pavement removal, common excavation, aggregate base gravel; erosion and traffic control and cleanup. No Proposal will be considered unless it is accompanied by a bid security in the form of a bid bond or certified check in the amount of ten percent (10%) of the total bid price, made out in favor of the City of Lewiston. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated. A Performance Bond and a Labor and Material Payment Bond, preferably executed on AIA Bond Form Number A311, in an amount equal to the total Contract price, of a surety company satisfactory to the Purchasing Agent, will be required of the successful bidder to ensure completion of the work and the proper fulfillment of the conditions of the Contract. The total Contract price shall mean the total bid price as stated in the Proposal based on the estimated quantities of the various items of work. Questions and Requests for Information shall be submitted to Justin Bisson (jbisson@lewistonmaine.gov) on or before noon, July 13, 2023. The City reserves the right to negotiate with the low bidder to bring projects down to within budget. The scope of work for this program, shall consist of, but not be limited to, furnishing and installing (except as noted) all materials labor and equipment necessary to resurface or rehabilitate streets or roads as listed, including: utility cover adjustments: water gate box lowering and raising, tack coat, shim, and overlay; driveway preparation and lawn and driveway restoration; pavement removal, common excavation, aggregate base gravel; erosion and traffic control and cleanup. Scope: Remove existing pavement and curb. Saw cut and remove 5' of roadway on South Side, install new sidewalk adding 6" of MDOT Type A gravel. Saw cut and remove 18" of pavement to install new concrete curb on North Side of Vale Street. Remove 6" of existing gravel on North Side, and replace with 6" of new MDOT Type A Gravel. Adjust catch basins to proper height. Install new slip-form concrete curb. Fine Grade sidewalks and driveways. Place 9.5 mm HMA at 2" in one lift. Install new detectible warning plates. Perform lawn repair as needed

Final Planning

Sidewalks / Parking Lot

$308,393.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
54
Bidding Soon
1,006
All Active Projects
272
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 19, 2023

February 17, 2024

November 15, 2023

img_map_placeholder

Vale St, Lewiston, ME

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.