BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a bridge / tunnel in Fremont, California. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The existing embankment at the west end of the Old Canyon Road bridge has experience scouring from the series of atmospheric river storms in early 2023. The bridge slope repair work shall consist in general, of the following, 'ION repairing the large void in the existing slope paving at the southwest corner bridge pier and placing concreted 1/4-ton rock slope protection over exposed pier 1 column steel casing And other such items per the plans & specs. Estimated Project Cost. The estimated construction cost, or construction cost range, for the Project is $25,000.00. This estimate serves only as a guideline to bidders of the scope of the Work and the Project. No bidder, including the successful bidder, is entitled to make any claim against City based on inaccuracy of the estimated cost or range of cost of the Work or the Project. License and Registration Requirements. License. This Project requires a valid California contractor's license for the following classification(s): Class A. Contractors bidding as a joint venture must secure a joint venture license prior to award of the Contract for the Project. DIR Registration. City may not accept a Bid Proposal from, or enter into the Contract with, a bidder without proof that the bidder is registered with the California Department of Industrial Relations ("DIR") to perform public work under Labor Code Section 1725.5, subject to limited legal exceptions. Time for Completion. The planned timeframe for commencement and completion of construction of the Project is: Ten (10) Working Days

Award

Bridges / Tunnels

$27,490.00

Public - City

Paving, Site Work

5

10

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
84
Bidding Soon
1,765
All Active Projects
753
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2023

August 15, 2023

img_map_placeholder

Old Canyon Rd, Fremont, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.