Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Friendswood, Texas. Contact the soliciting agency for additional information.
Submittal Shall Be Signed by a Person Having Authority to Bind the Qualified Professional in a Contract. The City of Friendswood, Texas and the Galveston County Consolidated Drainage District (GCCDD) are seeking a qualified engineering firm to complete the City of Friendswood Comprehensive Master Drainage Plan. The City of Friendswood previously completed a Master Drainage Plan Phase I in November 1993 (Claunch & Miller / Albert H Halff Associates, Inc.) and a Master Drainage Plan Phase II in March 2007 (Costello, Inc.). Since 2007, the City of Friendswood experienced devastating flooding during Hurricane Harvey in 2017: over 3,000 homes were inundated with high water and over 1,000 residents were rescued from their homes. The City and GCCDD have since prioritized drainage and flood reduction and have partnered with other public agencies to build local and regional flood reduction projects along Clear Creek and its tributaries. The Comprehensive Master Drainage Plan will build upon existing studies and data from the City of Friendswood and GCCDD with the primary goal being to identify and address critical drainage problems (both riverine and urban in nature) and to create an effective tool to manage existing and future development. The City of Friendswood, Texas (the "City") is requesting qualifications ("RFQ") from qualified professionals ("Respondents") experienced in providing professional services using generally accepted engineering and planning practicesto complete the 2023 update to the City's Master Drainage Plan. The 2023 Comprehensive Master Drainage Plan (the "Study") will include, but is not limited to, creating a 1D/2D and/or 2D model(s) to assess flood prone areas and inform the development of up to fifteen drainage and flood reduction project alternatives, benefit cost determination of the proposed alternatives along with other critical project characteristics to inform a prioritized project development schedule, and determination of easement boundaries for Clear Creek and its tributaries. All models developed along with associated data (including ARCGIS geodatabase(s), Excel files, and any calculations) will become the property of the City upon completion of the Study All Submitted Materials Must Be Clearly Marked With RFQ No. 2023-14, 2023 Comprehensive Master Drainage Plan, and Addressed to the City of Friendswood, Attn: City Secretary, and Are to Be Received at Friendswood City Hall, City Secretarys Office, 910 S. Friendswood Dr., Friendswood, Texas 77546 For additional information, please contact Jildardo Arias, Director of Engineering at (281) 993-3411 or via email to engineering@friendswood.com. SUBMIT QUESTIONS TO: Jildardo Arias, PE, CFM, ENV SP Director of Engineering, City Engineer City of Friendswood engineering@friendswood.com (281) 993-3411 Proposal Evaluation July 26th -August 16th, 2023 Council Consideration September 11, 2023 The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 26, 2024
Multiple Locations, Friendswood, TX
Related To This Project
Friendswood, TX
--
Friendswood, TX
Bid Date: Jul 20 2023
Friendswood, TX
--
Friendswood, TX
--
Friendswood, TX
--
Friendswood, TX
Bid Date: Nov 03 2021
Friendswood, TX
--
Friendswood, TX
--
Friendswood, TX
--
Friendswood, TX
Bid Date: Jul 25 2023
Friendswood, TX
--
Friendswood, TX
Bid Date: Jun 28 2023
Friendswood, TX
--
Friendswood, TX
--
Friendswood, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.