BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a municipal facility in Fairbanks, Alaska. Completed plans call for the demolition of a municipal facility; and for site work for a municipal facility.

The City reserves the right to waive informalities not inconsistent with the law and to reject any or all bids. Removal of the following hazardous materials: Friable Asbestos Abatement and Demolition, Non-Friable Asbestos Abatement and Demolition, Refrigeration Units, Glycol Heating System, and Polychlorinated Biphenyls (PCB) Abatement and Demolition. Non-Hazardous Materials Demolition consisting of removing the Polaris TOWER structure to the Polaris Tower, roof, walls, floor, miscellaneous construction materials such as metal studs, sheetrock, insulation, piping, etc., and miscellaneous hotel and restaurant equipment and material, etc., as shown in the plans and specifications. The project will consist of demolishing and removing the existing POLARIS TOWER building. Work includes but is not limited to: o Removal of the following hazardous materials: Friable Asbestos Abatement and Demolition, Non-Friable Asbestos Abatement and Demolition, Refrigeration Units, Glycol Heating System, and Polychlorinated Biphenyls (PCB) Abatement and Demolition o Non-Hazardous Materials Demolition consisting of removing the Polaris TOWER structure to the Polaris Tower, roof, walls, floor, miscellaneous construction materials such as metal studs, sheetrock, insulation, piping, etc., and miscellaneous hotel and restaurant equipment and material, etc., as shown in the plans and specifications. o Basement wall reinforcement and backfill as shown in the plans and specifications. Shoring as needed to fill the demolition pit with borrow to ground level, compacted to 95%. o Cap entire area with 4-inches of RAP (recycled asphalt pavement) and grade from east side of TOWER lot to Lacey St./1 st Ave top back of sidewalk at 1%. o Flashing, HBHs and jersey barriers as shown in the plans and specifications. o Provide traffic control and site security for the duration of the project. o Coordination with business owners in the vicinity impacted by this project.

Award

Municipal

$8,995,600.00

Public - City

Demolition, Site Work

17

7

2

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
12
All Active Projects
2
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2023

August 16, 2023

img_map_placeholder

Lacey St, Fairbanks, AK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.