Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Potterville, Michigan. Completed plans call for the renovation of a educational facility.
Specifications : (Carehawk). The new system for the High School and middle school shall have a minimum of 80 circuits, two administrative phones, IP telephone interface(analog), expandable to 256 circuits, five additional phone or administrative circuits, network interface for programing(calendar), two voice paths and one program. Every classroom shall have a call-in switch and be able to independently be programmed for bells and paging. System shall also be able to record wave files and use as replacement for bells. The system shall be of the same manufacture as the existing Elementary system (Carehawk). The new system for the High School and middle school shall have a minimum of 80 circuits, two administrative phones, IP telephone interface(analog), expandable to 256 circuits, five additional phone or administrative circuits, network interface for programing(calendar), two voice paths and one program. Every classroom shall have a call-in switch and be able to independently be programmed for bells and paging. System shall also be able to record wave files and use as replacement for bells. The system shall be installed as a wall field in the existing MDF. The contractor will be required to install a % x4x8 fire rated plywood backboard . The existing Simplex intercom shall be removed at its existing location. All reused existing cable is to be relocated above the existing ceiling in a appropriated sized steel j-box and spliced to new plenum cable . New installed cable to be properly supported in Bridle rings to MDF. All existing 45 ohm speakers to be replaced with industry standard constant voltage speaker assembly's with 25/70 volt transformers. All existing volume controls in occupied offices to be replaced with new. All interior horns to be replaced with tamperproof speakers. The existing gym shall have two new horns in a tamperproof box. Provide 25volt to 600 ohm transformers and power amplifiers for the following areas. One 30 watt amplifier for the middle school hallway, one 60 watt amplifier for the high school hallway, one 60 watt amplifier for the existing cafeteria and one 250 watt amplifier for the exterior(outside). provide one Toa CS-304 horn pointing toward the picknick tables outside the existing library. The Carehawk central cabinet to be CH-2I-2A-1PG. The administrative consoles are to be installed in the central office and the middle/high school office. Contractor to supply all necessary hardware and labor for a complete system. Contractor shall also provide a training session for staff for Calendar(bell and paging zone scheduling and system operation.
Award
Educational
$46,433.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2023
August 9, 2023
Multiple Locations, Potterville, MI
Related To This Project
Potterville, MI
Bid Date: Jan 27 2022
Potterville, MI
Bid Date: Nov 08 2023
Potterville, MI
Bid Date: Feb 06 2024
Potterville, MI
Bid Date: Oct 04 2024
Potterville, MI
Bid Date: Nov 13 2024
Potterville, MI
--
Potterville, MI
Bid Date: Jun 16 2022
Potterville, MI
Bid Date: May 05 2022
Potterville, MI
Bid Date: Nov 03 2022
Boon, MI
Bid Date: Aug 02 2023
Saint Ignace, MI
Bid Date: Jul 26 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.