BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Taylorville, Illinois. Completed plans call for the renovation of a municipal facility.

The work consists of demolition of existing wood framed windows throughout portions of the basement and all of first, second and third floors. Contractor is hereby notified that the window caulk contains asbestos and will be impacted during demolition operations. The work also includes the provision and installation of new aluminum clad wood framed windows with insulated glazing. Latest Time to Submit Request for Interpretation: Monday, July 10, 2023 This project must be complete and ready to operate by March 15, 2024. A penalty of $100.00 shall be deducted from the final payment for EACH CALENDAR DAY the system is not able to operate after March 15, 2024 Further, the final payment shall be withheld until the Construction Inspector agrees that all provisions of these specifications have been satisfactorily accomplished. Bids shall be accompanied by a bid security in the form of a bid bond, certified check, cashier's check, or bank draft in the amount of 10% of the bid amount. Upon acceptance of the Contractors bid the Contractor shall be required to procure and pay for a Performance Bond, and Labor and Material Payment Bond in an amount equal to 100 percent of the bid amount. Bonds shall comply with all laws of the State of Illinois governing public contracts let by government units. The County of Christian reserves the right to reject any or all bids or waive any informality in any bid and to accept any bid considered advantageous to the County. Further, the County of Christian, when its opinion is in the best interest of the County, reserves the right to: 1) accept any bid; 2) wave technical deficiencies and irregularities; 3) allow bidder to remedy technical deficiencies or irregularities within a stated time; 4) rescind any notice of award if the County of Christian determines the notice of award was issued in error; 5) re-bid any contract. William R. Kennedy, or successor appointed by the chairman of the board, will act as Construction Inspector for the County.

Award

Municipal

$1,048,000.00

Public - County

Renovation

15

11

6

6

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
48
Bidding Soon
827
All Active Projects
346
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2023

October 23, 2023

img_map_placeholder

101 S Main St, Taylorville, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.