Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Sandstone, Minnesota. Completed plans call for site work for a water / sewer project.
There will not be a mandatory pre-bid site visit. However, contractors are encouraged to look at the site. Any contractor submitting a bid, must contact Carla Dunkley prior to submittal to ensure that a pre-bid addendum has not been issued. General Notes: 1. It is the Contractors responsibility to identify any and all discrepancies in the scope of work, not meeting Industry Standards or that which is inconsistent with the MN Chapter 7080 and Mille Lacs Band of Ojibwe 2016 MLB Project Specification Book. 2. All electrical wiring, apparatus and equipment for electric light, heat and power, technology circuits or systems shall comply with the rules of the Department of Commerce or the Department of Labor and Industry, as applicable, and be installed in conformity with accepted standards of construction for safety to life and property. 3. Contractor must reconnect all utilities, service panel or service feed. 4. Contractor will secure all permits and fees. 5. Contractor is responsible for a thorough investigation of the scope of work. 6. Contractor will repair any damage to the property or structure created by the scope of work. 7. Contractor shall be responsible for all debris removal related to all work performed under this work scope. 8. NO WORK SHALL BE PERFORMED UNTIL ALL REQUIRED PERMITS HAVE BEEN ISSUED AND COPIES IN THE POSSESSION OF THE PROJECT COORDINATOR AND /OR MILLE LACS BAND BUILDING OFFICIAL. COMMUNITY DEVELOPMENT WILL, TO THE GREATEST EXTENT FEASIBLE, GIVE PREFERENCE IN THE AWARD OF CONTRACT TO INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC ENTERPRISES. Work Scope Description: Please note that bids will only be accepted from licensed septic installers performing 34% or more of the work scope themselves. Bids will not be accepted from general contractors. 2016 MLB Spec Book, MN Chapter 7080 and Approved Septic Design by Environmental Systems Dated 6/9/2023. Contractor shall provide all equipment, materials and labor to complete the work described or referenced in this rfp and within the provided Environmental Systems design. 1. Install an on-site septic system per the approved septic design provided by Environmental Systems dated 6/9/2023. Contractor shall ensure a complete and functional system. 2. The contractor shall have the existing septic tank pumped and crushed or filled. Contractor shall assume tank holds up to 1,600 gallons. Contractor shall complete tank abandonment form and submit a copy to the Project Coordinator, including pumping slip. 3. Contractor is responsible for cutting vegetation and tree removal as required to install the system in accordance to MN Chapter 7080. Contractor is responsible to cutting trees located within the mound foot print and immediately around the mound, as needed to access the area to construct said mound. Trees shall be cut flush with the ground. Any trees measuring 6" or more in diameter shall be cut into 8' sections and hauled to the DNR shed located on Ojibwe Rd. Smaller trees or brush cleared can either be chipped or hauled away for offsite disposal. 4. Contractor shall follow proper MN Chapter 7080 mound prep procedure, keeping traffic off the designated mound area. Contractor shall be responsible for the cost of any: compaction testing; re-design fees; or additional costs associated with system redesign or relocation; if these expenses are incurred due to contractor or subcontractor damaging the mound location. 5. Contractor shall provide and install alarm and control panel with flow meter per design. 6. Contractor shall be responsible for electrical connections and any required trenching. 7. Contractor will be responsible for all yard repairs caused by system installation, including grading, black dirt cover and seeding. 8. Contractor shall be responsible for contacting the inspector identified by the Mille Lacs Band to schedule inspection of scratch, tanks, rock bed and final cover. 9. Contractor shall also be responsible contacting Project Coordinator, Carla Dunkley, to schedule project site visits to see scratch, tanks and rock bed before covering. 10. Contractor shall provide an As-Built System drawing for submission to MLBO. 11. Contractor will not receive final payment until the Band's contracted inspector has completed a successful final inspection and issued a Certificate of Compliance; and Owner has been supplied with full lien waivers for all subcontractors and suppliers. 12. Contractor is responsible for calling Gopher One before digging. 13. For bids totaling $25,000 or more, .5% TERO tax fee shall be included in the base bid and paid to the TERO office prior to receipt of final contract payment. 14. Due to the weather dependent nature of the work, work is shall be completed as soon as possible but the contract will be drafted with a completion date of November 15, 2023. Specified Product Substitutions: No substitutions will not be allowed on products specified within the design. Contacts: Interested bidders shall contact Carla Dunkley, Project Management Compliance Officer at 320-630-2495 or by E-mail at carla.dunkley@millelacsband.com to be included on the bidder's list in the event that any addendums are issued for this project.
Post-Bid
Water / Sewer
$350,000.00
Public - Federal
Site Work
Documents for this project are exclusively Plans. If Specifications become available, we will add them here.
23
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 20, 2023
August 18, 2023
64190 Badger Rd, Sandstone, MN
Related To This Project
Sandstone, MN
Bid Date: Sep 07 2023
Sandstone, MN
Bid Date: Sep 13 2023
Sandstone, MN
Bid Date: Sep 13 2023
Sandstone, MN
Bid Date: Mar 02 2022
Sandstone, MN
Bid Date: Mar 14 2022
Sandstone, MN
Bid Date: Jan 13 2022
Sandstone, MN
Bid Date: Dec 01 2023
Sandstone, MN
--
Sandstone, MN
Bid Date: Jul 19 2023
Sandstone, MN
Bid Date: Jun 23 2023
Sandstone, MN
Bid Date: Jun 23 2023
Sandstone, MN
Bid Date: Jun 02 2023
Sandstone, MN
Bid Date: Jun 13 2023
Sandstone, MN
Bid Date: Jun 14 2023
Sandstone, MN
Bid Date: May 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.