BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Thornton, Colorado. Design plans call for site work for a water / sewer project.

As of September 14, 2023, an engineer has been selected and this project is in the design phase. It is anticipated bidding will commence in 3rd quarter 2024, with construction following. *The closed solicitation has been included below for reference: Reference Number 0000324196 The scope of this Professional Service Agreement includes the design for construction. Currently there are six (6) vertical turbine pumps of 10 million gallons per day (MGD) each, five (5) duty; one (1) stand-by, that are used to send water produced at WBWTP to the distribution system. The 54-inch pump discharge header, located inside the pump station, includes two (2) surge anticipation valves (SAV) that open during a surge event and send water back into the clearwell. The goal of the Project is to replace these valves with a hydropneumatics surge tank so that draining back to the clearwell no longer occurs, and to provide surge protection during existing and future pumping conditions whether high or low flow. Exhibit B presents the approximate proposed surge tank location. The 36-inch and 48-inch discharge headers in the yard, shown in Exhibit B, will need to be included in the design. All questions shall be directed in writing to Dennis Laurita, Senior Contract Administrator, 9500 Civic Center Drive, Thornton, CO 80229-4326, fax 303-538-7556, or e-mail - dennis.laurita@ThorntonCo.gov, 8:00 a.m. to 5:00 p.m., local time, Monday through Friday, excluding holidays.

Design

Water / Sewer

$400,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
38
Bidding Soon
983
All Active Projects
412
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2024

img_map_placeholder

To Be Determined, Thornton, CO

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.