BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in San Antonio, Texas. Contact the soliciting agency for additional information.

The San Antonio Water System is soliciting bids to install a static mixer, access manway, and drainpipe onto the existing Agua Vista 54-inch above-ground header piping. The SAWS Agua Vista Station is located at 20015 Hardy Oak Blvd, San Antonio, TX, and serves roughly a third of the San Antonio community. Lime solids buildup has been occurring in the existing steel piping where a calcium hydroxide solution process water is injected into the 54-inch piping. The installation of a static mixer is proposed to improve the efficiency and speed of mixing the solution with the supply water. The project will include installation of a branch piping extension and drain nozzle to facilitate access and maintenance activities in the pipeline. The work being requested includes labor, materials, tools, equipment, supervision, coordination, disposal fees, quality control, mobilization and demobilization to provide a complete and functional mixer system All work shall be carefully planned in advance and coordinated with SAWS such that it is performed within a limited shutdown period that shall not exceed 7 calendar days in total length. The specific dates for the shutdown will be scheduled within the month of February of 2024, and all work shall be completed and the new mixer system shall be fully operational and placed back into service on or before February 29, 2024. For technical assistance, please contact Ion Wave's Customer Success Team: 1-866-277-2645 x 4 or email support@ionwave.net. The San Antonio Water System Purchasing Department is willing to assist any bidder(s) in the interpretation of bid provisions or explanation of how bid forms are to be completed. Assistance may be received by visiting the Purchasing Office in the SAWS Main Office, 2800 US Hwy 281 North, San Antonio, TX 78212, or by calling (210) 233-3819. Question Cutoff Date: 7/7/2023 05:00 PM (ET) Please contact the SMWB Program Manager at 210-233-3420 or marisol.robles@saws.org for any questions pertaining to the Good Faith Effort Plan, the SMWB Program, or S.P.U.R. System reporting.

Post-Bid

Water / Sewer

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
45
Bidding Soon
2,344
All Active Projects
860
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2023

August 14, 2023

img_map_placeholder

20015 Hardy Oak Blvd, San Antonio, TX

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.