Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 12, 2023 at 8:00 PM
Updated January 26, 2024
Site work for a water / sewer project in Melfort, Saskatchewan. Completed plans call for site work for a water / sewer project.
Collaboration to finalize the detailed design of desludging component and optionally the liner component with MPE Engineering and SaskWater. Schedule A: Melfort Creek Slope Stabilization The rehabilitation of the Melfort Creek Valley must occur before desludging of the residuals pond due to high potential of significantly increased seepage during and after desludging. This scope includes the reconstruction of the valley slope using staged earthworks methods and is to include all in-water work along the Melfort Creek. Construction of the slope repair is to occur Fall of 2023. Schedule B: Residuals Ponds Remediation The residuals pond rehabilitation will include all items associated with repairing the ponds and fully commissioning the residuals management system. The residuals pond rehabilitation is to commence with dewatering and desludging both cells. Sludge is anticipated to be left on site for ongoing drainage. Upon completion of dewatering and desludging, the ponds are to be repaired and upgraded with new piping and structures. Desludging and pond rehabilitation construction is to occur in late spring / early summer of 2024.
Post-Bid
Water / Sewer
$1,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2023
September 4, 2023
100 Reservoir Dr, Melfort, SK
Related To This Project
Melfort, SK
Bid Date: Jul 25 2023
Melfort, SK
--
Melfort, SK
--
Melfort, SK
--
Melfort, SK
Bid Date: Sep 21 2023
Melfort, SK
Bid Date: Sep 28 2023
Melfort, SK
Bid Date: Mar 10 2022
Melfort, SK
Bid Date: Mar 10 2022
Melfort, SK
Bid Date: Jul 04 2023
Melfort, SK
Bid Date: Jun 29 2023
Melfort, SK
Bid Date: Jan 10 2024
Melfort, SK
--
Melfort, SK
Bid Date: May 11 2023
Melfort, SK
Bid Date: May 10 2023
Melfort, SK
Bid Date: Feb 28 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
