BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in New York, New York. Contact the soliciting agency for additional information.

The scope of this work is to provide preventative maintenance, repair of HVAC chiller and condenser systems including summer and winter switchovers of systems. Quarterly Preventive Maintenance Work (Every 3 months) 1. Startup of HVAC System for Summer and Winter 2. Inspection and general check-up of all HVAC units at all listed locations and provide report 3. Cleaning of equipment 4. Replace existing filters with new and provide report. 5. Refrigerant inspections - check pressures and quantity of refrigerant and provide report 6. Check compressor operating pressures 7. Check condition of fan belts, adjust or replace as needed (leave extra set of belts in unit) 8. Power wash condenser coils (at start up for Summer and Winter) 9. Chemically clean evaporator coils (at start up for Summer and Winter) including heat coils 10. Check operation of thermostats and calibrate as necessary 11. Check operation of safety controls and calibrate as necessary 12. Check condition of pulley and flywheels 13. Lubricate motors and bearings and tighten locking collars 14. Purge all condensate lines on a/c units and check condition 15. Check Freon levels - report units with leaks. 16. Check and adjust valves 17. Check running condition of all units - report any faulty parts with estimate. e.g. Condenser fan motor, blower motors, relays, limit controls, thermostats, etc. 18. All parts (filters/ belts/ spares/ cleaning solution/ etc.) and labor must be included in the base bid. 19. Maintenance of burners, heating control system and all related heating equipment including cleaning of heat coils. 20. Winter Turnover is to commence by October 1st and to be completed by October 31st or in a timeframe specified by NYCHA. 21. Summer Turnover is to commence by June 1st and be completed by July 1st or in a timeframe specified by NYCHA. Question Deadline 07/11/2023 at 2:00 PM ET

Post-Bid

Municipal

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
461
Active Projects
235
Bidding Soon
4,600
All Active Projects
2,124
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 14, 2023

October 16, 2023

img_map_placeholder

Multiple Locations, New York, NY

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.