BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Camp Verde, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The scope of work for this project includes furnishing all labor, materials, equipment, fixtures, and services required for the construction of roadway improvements on Camp Lincoln Road beginning at Montezuma Castle Highway to approximately 700' west of Montezuma Castle Highway, Camp Verde, Arizona, in accordance with the Plans, Specifications and Agreement documents. The project consists of the installation of a right turn lane into Camp Verde Elementary School, right turn lane onto Montezuma Castle Highway, drainage improvements, and related work as required. It is the intention of the Town of Camp Verde to enter into a Contract for the proposed Construction. Work includes but not limited to, earthwork; asphalt, curb, and sidewalk removal and replacement; storm drain installation; street striping and signage work per the Project documents, Plans and Technical Specifications included in this Agreement. All questions regarding the Project Specifications, Bidding Process, or General Information shall be in writing, submitted through electronically. No other questions will be addressed. Bidders shall be responsible for all licenses, permits, insurance, taxes and bonds required by the TOWN and the State of Arizona that apply to the performance of this contract. Question Deadline 07/25/2023 at 1:00 PM MT The Town of Camp Verde reserves the right to reject any or all bids, to waive formalities, and to accept the bid deemed to be in the best interest of the TOWN. The Project # 23-175 known as the Town of Camp Verde School Traffic Improvements Project , is the construction of roadway improvements on Camp Lincoln Road beginning at Montezuma Castle Highway to approximately 700' west of Montezuma Castle Highway, Camp Verde, Arizona, in accordance with the Plans, Specifications and Agreement documents. The project consists of the installation of a right turn lane into Camp Verde Elementary School, right turn lane onto Montezuma Castle Highway, drainage improvements, and related work as required. It is the intention of the Town of Camp Verde to enter into a Contract for the proposed Construction. Work includes but not limited to, earthwork; asphalt, curb, and sidewalk removal and replacement; storm drain installation; street striping and signage

Bid Results

Roads / Highways

$283,635.00

Public - City

Paving, Site Work

14

13

10

2

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
4
Bidding Soon
267
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2023

October 4, 2023

img_map_placeholder

410 Camp Lincoln Rd, Camp Verde, AZ


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.