Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and addition to a military facility in Cherry Point, North Carolina. Completed plans call for the addition of a 1,415-square-foot military facility; for the demolition of a military facility; and for site work for a military facility.
Project No.: 7297306 Title: FRCE Building Addition B4809 NAICS Code and Standard Size: 236220, Commercial and Institutional Building Construction Contractors, $45 Million Contract Completion Date: 365 days after award Estimated Cost Range: Between $1,000,000 and $5,000,000 Wage Determination: General Decision Number: NC20230065 01/06/2023 Liquidated Damages: $429.00 per Calendar Day Special Scheduling: None Basis for Award: Lowest Price Proposal Acceptance Period: 90 days from receipt of offers Site Visit: A site visit will be scheduled Wednesday 05 July 2023 at 0900. Contractors are to meet at the FEAD office, Building 87, MCAS Cherry Point This will be the ONLY Government Scheduled Site Visit for this Project. **Contractors are required to send an email to both Ericka Bishop and Joanna Miller, stating the individuals name and the company they work for if they will be attending the site visit. This information is required NLT COB 30 June.** Bond Requirements: Bid bonds are required in accordance with FAR 28-101-4. An electronic copy of your bid bond must be submitted with your proposal. An electronic copy of your bid bond will be requested from the apparent low upon confirmation of their price and must be submitted to the FEAD office within one (1) week from time of request. Failure to submit an electronic copy of your bid bond with your proposal will result in your proposal being deemed nonresponsive and your proposal removed from consideration. In accordance with FAR Clause 52.228-15 Performance and Payment Bonds--Construction and FAR Clause 52.228-13 Alternate Payment Protections, Payment and/or performance bond(s) will be requested at the time of award. BONDS TO BE PROVIDED ELECTRONICALLY, SEALS MUST BE VISIBLE o No bonds are required for proposals less than $40K. o Proposals valued at $40K and greater will require a payment bond only. Proposals valued at $150K and greater will require a bid bond, a payment bond, and a performance bond. FAR Clause 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 is applicable for this solicitation. FAR Clause 52.204-27, Prohibition on a Bytedance Covered Application (June 2023). DFARS 252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region--Certification, which includes a certification requirement stated below. DFARS 252.225-7060, Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region, which prohibits contractors from providing any products mined, produced, or manufactured wholly or in part by forced labor from XUAR or from an entity that has used labor from within or transferred from XUAR as part of any forced labor programs. Please either return an email or add the certification statement on your proposals stating the following: "Certification from (Please enter your company name here) that you have made a good faith effort to determine that forced labor from XUAR was not or will not be used in the performance of a contract resulting from this solicitation" Requests for Information (RFIs): RFIs must be submitted by the prime contractor to the email addresses above. The cut off for RFIs is 17 July 2023 by 9:00 AM EST in order to process all inquiries by the proposal due date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Military
$5,000,000.00
Public - Federal
Addition, Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2023
September 26, 2023
To Be Determined, Cherry Point, NC
Related To This Project
Cherry Point, NC
Bid Date: Aug 08 2023
Cherry Point, NC
Bid Date: Aug 02 2023
Cherry Point, NC
Bid Date: Aug 03 2023
Cherry Point, NC
Bid Date: Aug 02 2023
Cherry Point, NC
Bid Date: Aug 01 2023
Cherry Point, NC
Bid Date: Aug 03 2023
Cherry Point, NC
Bid Date: Aug 08 2023
Cherry Point, NC
Bid Date: Jul 08 2021
Cherry Point, NC
Bid Date: Jul 25 2023
Cherry Point, NC
Bid Date: Jul 20 2023
Cherry Point, NC
Bid Date: Jul 27 2023
Cherry Point, NC
Bid Date: Jul 28 2023
Cherry Point, NC
Bid Date: Jul 26 2023
Cherry Point, NC
Bid Date: Jul 25 2023
Cherry Point, NC
Bid Date: Jul 18 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.