BLOCK PAGE!!!

Subscribe For Access

Saving Project...

Demolition, site work and asbestos abatement for a religious / funeral development in New Bern, North Carolina. Completed plans call for the demolition of a religious / funeral development; for site work for a religious / funeral development; and for asbestos abatement for a religious / funeral development.

A. Carry out a first cleaning of all surfaces of the work area including plastic sheeting, tools, scaffolding and/or staging by use of damp-cleaning and mopping and/or a high efficiency particulate air (HEPA) filter vacuum until there is no visible debris from removed materials or residue on plastic sheeting or other surfaces. Do not perform dry-dusting or dry-sweeping. B. Equipment shall be cleaned and all contaminated materials removed before removing polyethylene from the walls and floors. C. The contractor shall replace all prefilters and clean the inside and outside of the HEPA exhaust units. D. After polyethylene sheets have been removed from walls and floors, the contractor shall clean all surfaces in the work area with amended water and/or HEPA-filtered vacuum. E. After cleaning the work area, the contractor shall allow the area to thoroughly dry and then wet-clean and/or HEPA vacuum all surfaces in work area again. F. At the completion of the cleaning operation, the contractor's supervisor shall perform a complete visual inspection of the work area to ensure that the work area is dust- and fiber-free. If the supervisor believes he is ready for a final project decontamination inspection, he shall notify the designer. G. The designer shall contact the industrial hygiene firm and advise the firm of the final project decontamination inspection requested by the contractor. H. Final project decontamination inspection includes the visual inspection and air monitoring clearance. I. Visual inspection for acceptance shall be performed after all areas are dry. The Project consists of limited Hazardous Materials abatement prior to the future demolition of the existing Sudan Temple building located in New Bern, North Carolina. The project will include the abatement of interior materials only. The scope of the abatement and procedures are outlined in the specifications and reports provided by Affinity Environmental Consulting, LLC. The Project consists of limited Hazardous Materials abatement prior to the future demolition of the existing Sudan Temple building located in New Bern, North Carolina. The project will include the abatement of interior materials only. Bid Bond 5% A Performance Bond and a Payment Bond will be required for one hundred percent (100%) of the contract price. The owner reserves the right to reject any or all bids and to waive informalities. As of August 24, 2023 , this project has not yet been awarded. The project anticipated start date is in about 30 days.

Award

Religious / Funeral

$84,480.00

Public - County

Asbestos Abatement, Demolition, Site Work

5

9

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
53
Bidding Soon
635
All Active Projects
298
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 20, 2023

August 21, 2023

January 28, 2024

img_map_placeholder

403 E Front St, New Bern, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.