BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Muscatine, Iowa. Completed plans call for site work for a water / sewer project; and playground / park / athletic field.

Base Bid 1 (Feature 1): Work consists of raising and strengthening the mainstem levee for approximately 16,400 LF from STA. 170+00 (Maple Grove Road) to STA. 334+00 (Muscatine-Louisa County Line). Borrow sand for the project will be excavated from a historic stockpile area at the southeast corner of Deep Lakes County Park near 57th Street and Pettibone Ave (Approximately 54,000 CY). Sand will be hauled to the levee material staging area(s). The sand will then be graded and compacted to match drawings and specifications. Following grading operations, all disturbed areas of the site will be seeded. Scope includes post construction repair of 57th St for any damages during hauling operations for both base bids. Base Bid 2 (Feature 2): Work consists of the construction of approximately 1,100 LF hardened controlled overtopping reach and approximately 1500 LF of levee settlement repair near STA. 700+00. Any borrow sand for the project will be excavated from a historic stockpile area at the southeast corner of Deep Lakes County Park near 57th Street and Pettibone Ave (Approximately 23,000 CY). Sand will be hauled to the site and graded and compacted to match drawings and specifications. A 2,700 LF temporary haul route will be constructed to accommodate traffic to the project site from the X61 site entrance. The overtopping reach will be overlaid with 160,000 sq. ft. of specialized geosynthetic turf surface with cementitious infill . 1,250 tons of class B revetment will be placed at the downstream end of the overtopping structure, with 835 tons of class E revetment bedding stone. A 2350 LF concrete tie-in trench (approx. 2x2) will be installed along the perimeter of the Hydroturf CS application. Following grading operations, all disturbed areas of the site will be seeded. A certified check or bank draft, payable to the order of Muscatine Island Levee District, negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. The Muscatine Island Levee District reserves the right to reject any or all Bids or to waive any informality in the bidding Technical questions regarding interpretations of the bidding documents shall be directed to Joshua T. Leyh PE of Klingner & Associates PC at 319-752- 3603; jleyh@klingner.com NOT City Blue Technologies.

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

Site Work

62

20

11

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
46
Bidding Soon
472
All Active Projects
227
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2024

April 8, 2024

img_map_placeholder

Multiple Locations, Muscatine, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.