BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Whittier, California. Completed plans call for site work for a water / sewer project.

Site Directions: 1971 Workman Mill Road, Whittier, CA 90601 San Jose Creek WRP Stage III Primary Sedimentation System Expansion Project Category Code: Electrical and Controls, Miscellaneous, Instrumentation, Demolition/Building Removal/Hauling/Salvage, Concrete Pavement, Mechanical Systems, Sitework/Excavating and Grading, Painting, Water and Wastewater Facilities, Pumps or Pump stations, Water/Wastewater Infrastructure, Excavation, Electrical. Description: The project will expand primary sedimentation facilities at San Jose Creek West to increase wet weather treatment capacity at San Jose Creek, and ensure wet weather primary influent redundancy for the combined SJC influent pumping system. The scope of work for this project will include construction of two primary sedimentation tanks; associated flight and primary skimmings drive; installation of odor control cover and other ancillary equipment; extension of Channel No. 1 and Gallery No. 1; concrete repair and installation of PVC liner in Channel No. 2 and step feed channel. The work of construction must be completed within 500 WORKING DAYS after the date in the Notice to Proceed. Est. Value Notes: $17,200,000 - $21,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Water / Sewer

$21,355,500.00

Public - County

Site Work

155

9

32

8

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
210
Active Projects
122
Bidding Soon
2,243
All Active Projects
1,061
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2023

October 30, 2023

img_map_placeholder

1971 Workman Mill Rd, Whittier, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.