Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in New York, New York. Completed plans call for the renovation of a municipal facility.
SCOPE OF WORK: A. The scope of this work is to provide preventative maintenance, repair of HVAC chiller and condenser systems including summer and winter switchovers of systems. B. Quarterly Preventive Maintenance Work (Every 3 months) 1. Startup of HVAC System for Summer and Winter 2. Inspection and general check-up of all HVAC units at all listed locations and provide report 3. Cleaning of equipment 4. Replace existing filters with new and provide report. 5. Refrigerant inspections - check pressures and quantity of refrigerant and provide report 6. Check compressor operating pressures 7. Check condition of fan belts, adjust or replace as needed (leave extra set of belts in unit) 8. Power wash condenser coils (at start up for Summer and Winter) 9. Chemically clean evaporator coils (at start up for Summer and Winter) including heat coils 10. Check operation of thermostats and calibrate as necessary 11. Check operation of safety controls and calibrate as necessary 12. Check condition of pulley and flywheels 13. Lubricate motors and bearings and tighten locking collars 14. Purge all condensate lines on a/c units and check condition 15. Check Freon levels - report units with leaks. 16. Check and adjust valves 17. Check running condition of all units - report any faulty parts with estimate. e.g. Condenser fan motor, blower motors, relays, limit controls, thermostats, etc. 18. All parts (filters/ belts/ spares/ cleaning solution/ etc.) and labor must be included in the base bid. 19. Maintenance of burners, heating control system and all related heating equipment including cleaning of heat coils. 20. Winter Turnover is to commence by October 1st and to be completed by October 31st or in a timeframe specified by NYCHA. 21. Summer Turnover is to commence by June 1st and be completed by July 1st or in a timeframe specified by NYCHA.
Post-Bid
Municipal
$400,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 24, 2023
September 25, 2023
Multiple Locations, New York, NY
Related To This Project
New York, NY
Bid Date: Jul 19 2023
New York, NY
Bid Date: Jul 19 2023
New York, NY
Bid Date: May 27 2021
New York, NY
--
New York, NY
--
New York, NY
--
Construction Management Services for the North River Wastewater Resource Recovery Facility - 5123168
New York, NY
Bid Date: Aug 25 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.