BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Santa Maria, California. Completed plans call for the renovation of a water / sewer project.

***As of August 18, 2023. Project has been awarded to USG Water Solution but award amount is not available. the services of a qualified and experienced contractor to include our 6 reservoir tanks into a Tank Asset Management Program. In addition, all components of the tanks will be brought up to like new condition. Questions may be submitted, by written request, for an interpretation or correction thereof. Fax inquiries to: Theresa Hernandez, (805) 735-7628 or email t_hernandez@ci.lompoc.ca.us. Last day to submit questions is July 14, 2023 at 4pm. Abrasive blast clean complete interior surfaces to a SSPC-SP10 Near White finish. Remove all dust and blast products by high-pressure air, vacuum cleaning or brushing and apply the first coat of paint before any surface rust develops. Using Sherwin Williams Macropoxy 5500 LT or equivalent thinned 10%, stripe paint all welded/lap seams and pitted areas with a roller or brush. Apply one (1) full coat of Sherwin Williams Corothane I GalvaPac 1K Zinc Primer or equivalent at a DFT of 3 to 4 mils to the complete interior of the tank, riser pipe, and all other interior surfaces. Apply a second full coat of Sherwin Williams Macropoxy 5500 LT or equivalent at a DFT of 5 to 10 mils to the complete interior of the tank, riser pipe, and all other interior surfaces. Total minimum dry film thickness (DFT) for the interior two-coat system is nine (9) mils. Depending on the surface temperature, the coatings will be allowed to cure as stated on the product data sheet. Provide adequate ventilation during curing. After the coating system has adequately cured, disinfect the interior using the AWWA C-652 Method 2 Spray Method and seal for service. Plate laps or voids greater the in width shall be filled with applicable backer and Sika Flex 1A or equivalent.

Award

Water / Sewer

$400,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
19
Bidding Soon
272
All Active Projects
122
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2023

August 24, 2023

img_map_placeholder

Multiple Locations, Santa Maria, CA

Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.