BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Bon Accord, Alberta. Completed plans call for site work for a playground / park / athletic field.

The Town of Bon Accord is requesting proposals for the provision and installation of playground equipment (including borders and surfacing) in Centennial Park and Springbrook Park. 1. The Town is seeking innovative designs for two play spaces that correspond and compliment the existing play equipment in the following two parks: a. Play Space #1: Centennial Park: replacement of an old swing set with a new, inclusive play structure or several small play equipment choices that will fit in this space. Note, this park has an amphitheatre and is home to many community events throughout the summer months. Therefore, as per the map shown in Appendix #1, there is limited space for play equipment or structures. b. Play Space #2: Springbrook Park: replacement of the existing swing set with a new swing set that includes swings for all ages and abilities. This park has two possible placement locations for new swings: the existing location or a second location option according to the map shown in Appendix #2. The existing playground in this space will be replaced in the future, hence the new swing set will need to allow for future playground development. 2. The playground structure should be designed to accommodate children between the ages 5 - 12 years. 3. The playground must be inclusive/accessible for all children. 4. Maximize activity stations and play components for the stated budget. 5. The Town requires that the playground equipment be delivered and installed by the Proponent. The Proponent will also supply all materials, equipment, and labour required for the installation of the playground equipment. The Proponent will be responsible for excavating the site, removing old play equipment, and full installation of the new play equipment, surfacing and borders to current safety standards within the stated timelines. 6. The Proponent will be responsible for heavy metal fencing to be erected during the excavation, removal of old equipment and install of new equipment considering encroachment areas of existing play equipment. The fencing shall stay in place until the new play space may be opened to the public. The Proponent shall be responsible for removal of fence once the project is completed. 7. All proposals are to meet the following: a. CSA Compliant Children's Play Spaces and Equipment National Standard of Canada intended for use by children ages 5 - 12. b. Ability to fit into the area identified in appendix #1 and appendix #2. c. Ability to provide certificate or statement of compliance (including play equipment and installation) to CSA standards 8. Provide manufacturers and installation warranty and maintenance on playground surfacing, structures, and equipment. Centennial Park (Budget $50,000) Springbrook Park (Budget $65,000)

Award

Playgrounds / Parks / Athletic Fields

$106,642.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
15
Bidding Soon
243
All Active Projects
88
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2023

August 28, 2023

img_map_placeholder

Multiple Locations, Bon Accord, AB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.